Connally ISD - Primary
- Year Built2003
- Square Footage81,453
- Replacement Cost$45,807,644
- Condition Budget$5,089,870
- Facility Condition Index13%
Condition Assessment
System Rating ScoreGood
Fair
(or will require attention in near future 3-10 years)
Poor
(or will require attention now 0-2 years)
Exterior
Poor
Exterior Structure: Inspect exterior expansion caulking and repair or replace as necessary.
Good
Foundation: No issues observed or reported.
Fair
Parking/Traffic: Repair potholes and moderate cracking and apply slurry coat to minor cracking to extend life of roadways. Repair moderate cracking, apply slurry coat to minor cracking, and restripe front parking lot. ADA van parking signage is needed at Cafeteria.
Fair
Site: Repair damaged and cracked sidewalks at the entrance and around the building.
Fair
Doors: Refinish exterior metal doors. Refinish interior wooden doors.
Fair
Exterior/Interior Windows: Replace window systems with double pane energy efficient window systems. Evidence of water leaks and attempted repairs were observed.
Good
Roof: Area 1: Primary Single Ply Roof - The roof is in good condition. The roof flashings and seams should be inspected and repaired as necessary. The roof should be inspected at least semi-annually and after every significant weather event.
Interior
Fair
Interior Structure: Refinish interior masonry and wallboard walls as necessary. While ceiling tile is generally in good condition, update the ceiling tile grid from 4x2 lay in ceiling tile to 2x2 lay in ceiling tile system. At a minimum, replace stained or damaged ceiling tiles.
Good
Plumbing: Inspect cafeteria staff restrooms for proper seal on plumbing fixtures.
Poor
ADA: ADA van parking signage is needed at Cafeteria lot.
Fair
Furnishing, Fixtures, Equipment: Update restroom stalls. Refinish damaged cabinet doors. Replace movable furnishings as needed.
Good
Electrical: Update lighting fixtures to LED fixtures.
Poor
Safety/Security: See Safety & Security recommendations on the Facility Details page.
Good
Flooring: Replace damaged resilient floor tiles as necessary. Deep clean ceramic tile and grout, replace any damaged or missing grout and tile.
Fair
HVAC: No issues observed or reported. HVAC system components are nearing end of useful life expectancy and should be planned for replacement.
Priority Projects
- See Safety & Security recommendations on the Facility Details page.
- Inspect exterior expansion caulking and repair or replace as necessary.
- ADA van parking signage is needed at Cafeteria lot.
- Repair damaged and cracked sidewalks at the entrance and around the building.
Additional Projects, if Funds Become Available
- Pave gravel parking lot
- Refinish interior masonry and wallboard walls as necessary.
- While ceiling tile is generally in good condition, update the ceiling tile grid from 4x2 lay in ceiling tile to 2x2 lay in ceiling tile system and at a minimum, replace stained or damaged ceiling tiles.
- Inspect cafeteria staff restrooms for proper seal on plumbing fixtures.
- Repair potholes and moderate cracking and apply slurry coat to minor cracking to extend life of roadways.
- Repair moderate cracking, apply slurry coat to minor cracking, and restripe front parking lot.
- Update restroom stalls.
- Refinish damaged cabinet doors.
- Replace movable furnishings as needed.
- Update lighting fixtures to LED fixtures.
- Refinish exterior metal doors.
- Refinish interior wooden doors.
- Replace window systems with double pane energy efficient window systems.
- Replace damaged resilient floor tiles as necessary.
- Deep clean ceramic tile and grout, replace any damaged or missing grout and tile.
- Pave gravel parking lot.
Utilization
90% Capacity: Highly Utilized
Capacity
Pupil Count
Student Enrollment
498
Functional Capacity
554
Facility Condition Index
FCI: 13%
Educational Adequacy Assessment
System Rating ScoreAdequate Spaces
Needs Improvement
Not Adequate
Good
Core Classrooms: Core classrooms are generally in good condition. 1st grade classrooms are generally undersized, but are in good condition. 1st grade class capacity is 20 students. Additional classroom space can be gained from consolidating special use rooms.
Good
Cafeteria: Cafeteria is in good condition and appears to meet the campus needs.
Good
Occupant Flow: Occupant flow within the facility appears adequate.
Poor
Security: See Safety & Security recommendations on the Facility Details page.
Good
Site Playgrounds/Extra Curricular: Site Playgrounds appear to be in good condition. Some of the playground equipment was under construction.
Good
Special Education: Special Education spaces are generally in good condition and appear to meet campus needs.
Good
Physical Education: Physical Education spaces are in good condition and appear to meet campus needs.
Fair
Library: Library is in good condition and furniture appears appropriately sized. The library is undersized by 1,155 SqFt by TEA recommendations. If additional space is needed, consider constructing an addition.
Good
Administration: Administrate space within the facility appears adequate.
Actions to Improve the Educational Environment
The educational environment of the facility is in good condition. Updating interior lighting to LED is recommended.