Connally ISD - Operations - Maintenance
- Year Built2008
- Square Footage8,986
- Replacement Cost$5,958,185
- Condition Budget$491,602
- Facility Condition Index10%
Condition Assessment
System Rating ScoreGood
Fair
(or will require attention in near future 3-10 years)
Poor
(or will require attention now 0-2 years)
Exterior
Good
Exterior Structure: No issues observed.
Good
Foundation: No issues observed.
Fair
Parking/Traffic: Recommend paving gravel roadways. Apply slurry coat to reseal parking lot and restripe spaces.
Good
Site: No issues observed.
Fair
Doors: Refinish exterior doors and update non-ADA compliant door hardware. Refinish interior wooden doors and update non-ADA compliant door hardware as necessary.
Good
Exterior/Interior Windows: No issues observed.
Good
Roof: Area 1: Maintenance Roof - Evidence of minor hail damage was observed. Roof flashings, seams, and fasteners should be inspected and repaired as necessary. The roof should be inspected at least semi-annually and after every significant weather event.
Interior
Fair
Interior Structure: Refinish interior walls as necessary. Repair damaged wallboard ceilings and refinish restroom ceilings. Replace stained ceiling tiles as necessary.
Good
Plumbing: No issues observed or reported.
Poor
ADA: Two ADA parking spaces including one ADA van space is needed.
Good
Furnishing, Fixtures, Equipment: No issues observed.
Good
Electrical: Update interior light fixtures to LED.
Fair
Safety/Security: See Safety & Security recommendations on the Facility Details page.
Good
Flooring: Replace damaged sections of resilient floor tile as necessary.
Poor
HVAC: Replace HVAC system components at or beyond useful life expectancy. Install new controls and test and balance HVAC systems after installing new units.
Priority Projects
- See Safety & Security recommendations on the Facility Details page.
- Replace HVAC system components at or beyond useful life expectancy; Test and balance HVAC systems after installing new units.
Additional Projects, if Funds Become Available
- Install new controls and instrumentation with installation of new HVAC units.
- Test and balance HVAC systems after installation of new HVAC units.
- Refinish interior walls as necessary.
- Repair damaged wallboard ceilings and refinish restroom ceilings.
- Replace stained ceiling tiles as necessary.
- Inspect roof seams, flashings, and fasteners and repair as necessary.
- Apply slurry coat to reseal parking lot and restripe spaces.
- Add appropriate ADA parking and signage to parking lot; two ADA parking spaces including one ADA van space is needed.
- Recommend paving gravel roadways.
- Update interior light fixtures to LED.
- Refinish exterior doors and update non-ADA compliant door hardware.
- Refinish interior wooden doors and update non-ADA compliant door hardware as necessary.
- Replace damaged sections of resilient floor tile as necessary.
Educational Adequacy Assessment
System Rating ScoreAdequate Spaces
Needs Improvement
Not Adequate
Good
Occupant Flow: Occupant flow within the facility appears adequate.
Fair
Security: See Safety & Security recommendations on the Facility Details page.
Good
Administration: Administrative spaces within the facility appear adequate.
Actions to Improve the Educational Environment
No educational activities take place at this facility. The maintenance facility assists the educational environment of other buildings.