Priority Projects

Main Campus- Football Stadium

  • Replace damaged wood flooring in press box.
  • Replace minor cracking in masonry walls.
  • Replace damaged and deteriorated wood roof support beams in the Field house.
  • Replace asphalt roof on storage buildings.
  • Replace metal roof on Press box.
  • Replace damaged fasteners and calking.
  • Install fire alarm system in all student occupied facilities.

Main Campus- JH.Library.CTE.Old Gym.Band.Special Events

  • Repair damaged exterior metal panels.
  • Replace missing fasteners and calking.
  • Repair damaged masonry and mortar, replace building seam calking.
  • Replace damaged and non-ADA compliant plumbing fixtures.
  • Replace HVAC units at or past their useful life expectancy.
  • Update duct work, web-based energy management system, test, and balance new HVAC units when installed.
  • Replace damaged sections of soffits and fascia.
  • Replace missing seam calking and fasteners on roof system.
  • Replace roof access hatch to meet current safety standards.
  • Replace cabling in student occupied facilities to meet current educational needs.
  • Incorporate all facilities into central communication system.
  • Install fire safety systems in all student occupied facilities.

Baseball, Softball and Ag. Complex

  • No priority projects identified at this time.

Main Campus- ES, Nurse, SpEd and ES Gym

  • Replace damaged wood siding and soffits on exterior of Nurse building.
  • Replace damaged and deteriorated exterior metal wall and soffit panels and repaint.
  • Repair damaged cracking in exterior masonry veneer.
  • Replace damaged fasteners and missing calking on roofing system.
  • Incorporate all student occupied facilities into central communication system.
  • Incorporate all student occupied facilities into central alarm system.
  • Install fire alarm system in all student occupied facilities.
  • Install secure Vestibule.

Main Campus- Maintenance

  • Replace damaged and deteriorated exterior metal wall panels.
  • Repair damaged panels, fasteners and missing sealants and paint.

Main Campus-Admin, HS, Café, Art and DAEP

  • Replace all wood siding.
  • Seal and paint.
  • Replace damaged exterior metal wall panels, replace missing calking and fasteners and paint.
  • Replace building seam calking and repaid minor cracking in masonry veneer.
  • Repair cracking is masonry walls.
  • Replace exterior metal stair systems and concrete fill.
  • Replace HVAC units at or past their useful life expectancy.
  • Update duct work as needed when HVAC units are replaced.
  • Update Energy Management system as needed when new HVAC units are installed.
  • Test and balance new HVAC units when installed.
  • Repair areas where ponding visible on roof systems and perform manufacturer-recommended maintenance.
  • Replace damaged and missing fasteners and calking.
  • Replace damaged gutters and downspouts.

Additional Projects, if Funds Become Available

Main Campus- Football Stadium

  • Bleacher repairs.
  • Repair minor cracks in Concessions exterior and repaint.
  • Replace damaged exterior wood siding and soffits and paint.
  • Replace damaged exterior metal wall panels and paint.
  • Paint interior surfaces.
  • Repair damaged wallboard surfaces and paint.
  • Replace damaged and deteriorated plumbing fixtures.
  • Replace fixtures that are non-ADA compliant in the field house.
  • Replace all damaged restroom stalls and accessories.
  • Repair or replace aged or damaged lockers, cabinets, and countertops as needed.
  • Replace damaged moveable furnishings as needed.
  • Install LED lighting.
  • Incorporate the field house facility into central data and communication system.
  • Replace damaged exterior metal doors and frames.
  • Repaint doors that are in fair condition.
  • Replace concession window coverings with rollup metal doors.
  • Replace damaged door panels and hardware that is deteriorated or non-ADA compliant and paint.
  • Replace damaged metal door panels and hardware and paint.
  • Replace window and frame at the Press Box.
  • Patch minor cracking in concrete flooring and reseal.
  • Bleacher repairs and painting.

Main Campus- JH.Library.CTE.Old Gym.Band.Special Events

  • Replace HVAC fencing at Special Events Building.
  • Replace damaged sections of gutters and downspouts.
  • Library expansion.
  • Administration space expansion.
  • Secure Vestibule.
  • Replace damaged and deteriorated handrails.
  • Repair minor damage and repaint bleacher stairs.
  • Paint interior masonry surfaces and wallboard surfaces.
  • Replace damaged wood paneling.
  • Repair wallboard ceiling surface and paint.
  • Replace stained, damaged, and missing ceiling tiles and grid sections.
  • Replace damaged and stained tectum panels.
  • Paint exposed metal structure in gym.
  • In science rooms workstations and safety features need to be upgraded and furniture replaced to meet the current program needs.
  • Replace damaged restroom accessories and stalls in locker rooms.
  • Replace damaged sections of built-in furnishings.
  • Replace damaged lockers and other moveable furniture.
  • Paint metal doors and storefront doors and replace calking around frames.
  • Replace damaged door hardware and refinish wood doors.
  • Repaint interior storefront doors.
  • Replace single-pane aluminum framed windows with energy-efficient units.
  • Replace damaged sections of damaged, stained and overall deteriorated floor surfaces.
  • Replace damaged sections of vinyl tiles.
  • Repair minor damaged to concrete floors and reseal/paint.
  • Replace all damaged and deteriorated ceramic floor tiles and mortar in locker room restrooms.
  • Replace HVAC fencing at Special Events Building.
  • Replace damaged sections of gutters and downspouts.
  • Library expansion.
  • Administration space expansion.
  • Secure Vestibule.
  • Replace damaged and deteriorated handrails.

Baseball, Softball and Ag. Complex

  • Repair masonry walls behind home plate.
  • Install gutters and downspouts.
  • Add additional lighting at Ag.
  • Barn.
  • Clean and reseal exposed concrete flooring in restrooms.
  • Repair masonry walls behind home plate.
  • Install gutters and downspouts.

Main Campus- ES, Nurse, SpEd and ES Gym

  • Replace gutters and downspouts.
  • Replace perimeter lighting
  • Replace roof insulation in PE Gym.
  • SpEd ramp updates
  • Secure Vestibule
  • PE Gym Addition
  • Replace railing with ADA compliant systems.
  • Replace building seam calking and paint all interior masonry surfaces.
  • Repair damaged wallboard and repaint.
  • Replaced damaged vinyl wallboards.
  • Replace damaged, stained, and sagging ceiling tiles and grid section.
  • Consider replacing system with a 2x2 grid.
  • Paint exposed interior metal support beams in PE Gym.
  • Replace damaged plumbing fixtures.
  • Plumbing systems 30 years or older should be inspected and repaired or replaced as inspection dictates; Replace HVAC units at or past their useful life expectancy.
  • Update duct work, web-based energy management system, test, and balance new HVAC units when installed.
  • Repair and replace all pedestrian pathways and ramps that are not ADA compliance.
  • Replace damaged restroom accessories and stalls.
  • Repair or replace aged or damaged lockers, cabinets, and countertops.
  • Replace damaged moveable furnishings as needed.
  • Mechanical systems 30 years or older should be inspected and repaired or replaced as inspection dictates.
  • Install LED lighting.
  • Update to fiber cabling and devices to support secure Wi-Fi as needed.
  • Review surveillance camera coverage for area covered and type of camera used, update where needed for adequate coverage.
  • Add additional access control units to all exterior entry points.
  • Install lighting control system.
  • Repair damaged metal door panels and replace damaged hardware.
  • Replace sections of frames that have been damaged.
  • Recalk around frames, replace weatherstripping and repaint.
  • Replace damaged wood door frames, hardware and panels, paint.
  • Replace all exterior window units.
  • Replace stained and damaged carpeted flooring.
  • Replace damaged and mismatched vinyl floor tiles.
  • Replace damaged ceramic floor tiles and mortar.
  • Replace gutters and downspouts.
  • Replace perimeter lighting.
  • Replace roof insulation in PE Gym.
  • SpEd ramp updates.

Main Campus- Maintenance

  • Replace metal roof systems that have aged past their useful life span.
  • Paint interior metal stairs.
  • Repair minor damaged to wallboard surfaces and paint.
  • Remove damaged surfacing and paint visible structural components.
  • Plumbing systems 30 years or older should be inspected and repaired or replaced as inspection dictates.
  • Replace HVAC units at or past their useful life expectancy.
  • Update duct work as needed when HVAC units are replaced.
  • Install web-based energy management system.
  • Test and balance new HVAC units when installed.
  • Replace damaged plumbing fixtures.
  • Repair or replace aged or damaged lockers, cabinets, and countertops as needed.
  • Replace damaged moveable furnishings as needed.
  • Replace damaged exterior metal door panels and non-ADA hardware and paint.
  • Replace damaged metal panels and hardware on overhead garage doors.
  • Replace interior metal door panels and hardware that are damaged and paint.
  • Replace vinyl floor tiles.
  • Clean and seal concrete flooring.

Main Campus-Admin, HS, Café, Art and DAEP

  • Civil engineer study.
  • Kitchen expansion
  • Workroom and Lounge addition.
  • Repair damaged surfacing and repaint interior masonry surfaces.
  • Repair damaged surfacing and repaint interior wallboard.
  • Replace damaged wall board in old Administration building.
  • Replace damaged interior wood paneling.
  • Replace damaged sections of wallboard ceiling and repaint.
  • Replace damaged, stained, and sagging ceiling tiles.
  • Consider replacing grid with 2x2' system.
  • Replace damaged and missing plumbing fixtures.
  • Plumbing systems 30 years or older should be inspected and repaired or replaced as inspection dictates.
  • Replace all parking and Drives.
  • Update kitchen equipment.
  • Replace damaged and deteriorated restroom stalls and accessories.
  • Repair or replace aged or damaged lockers, cabinets, and countertops as needed.
  • Replace damaged moveable furnishings as needed.
  • Replace damaged and cracked sections of pedestrian paving.
  • \ Install LED lighting.
  • Update network cabling, servers, switches, and routers as needed.
  • Review intercom system, update cabling and devices as needed.
  • Incorporate all facilities into central communication system.
  • Install access control system on all designated entrance doors.
  • Install fire alarm system in all student occupied facilities.
  • Install lighting control system.
  • Replace exterior wood door with a metal unit.
  • Replace damaged exterior metal door panels and damaged hardware.
  • Recalk around door frame and repaint.
  • Replaced damaged storefront door panels and hardware.
  • Repair damaged door hardware.
  • Replace damaged wood doors and frames.
  • Replace damaged door hardware and paint.
  • Replace damaged metal door hardware and paint.
  • Replace exterior window units.
  • Replace damaged, stained and overall deteriorated carpeted flooring.
  • Replace damaged and missing vinyl floor tiles.
  • Abate asbestos-containing floor tiles and replace.
  • Repair minor cracking in concrete floors and reseal.
  • Replace damaged ceramic floor tiles and missing or damaged mortar.
  • Civil engineer study.
  • Kitchen expansion

Completed Projects

Main Campus- Football Stadium

  • No Projects

Main Campus- JH.Library.CTE.Old Gym.Band.Special Events

  • No Projects

Baseball, Softball and Ag. Complex

  • No Projects

Main Campus- ES, Nurse, SpEd and ES Gym

  • No Projects

Main Campus- Maintenance

  • No Projects

Main Campus-Admin, HS, Café, Art and DAEP

  • No Projects

Facility Dashboard, and its Facility Condition Assessment (“FCA”) assumes “like for like” system(s). It does not take into consideration design changes or code upgrades. The Facility Condition Index (FCI) is a standard facility metric that evaluates a facilities identified deficiencies against the replacement cost of the entire facility to arrive at a replacement cost ratio. Our cost estimates are in current day dollars and should be used for planning purposes only. We encourage and recommend review and updating of your construction scope and estimates prior to seeking funding.