- Repair flashings at vents and HVAC units where deteriorated.
- Repair areas of single ply roof system where there is visible ponding and bubbling. Ponding or pooling should be at least reduced if not eliminated, clear all drainage restrictions and consider improving roof grading when needed to promote drainage.
- MS Administration Addition
- Gutters and downspouts.
Technology
- Metal roof system is reaching the end of its life-cycle and interior areas are showing signs of roof leaks. Manufacture-recommended maintenance should be implemented and further evaluation should be completed to determine ways to extend the life span.
- Install vent system over cooking ranges in culinary arts room.
Maintenance
- The metal roof system was installed in 1990 and has aged past its useful life cycle and the district should consider replacing it.
- Replace damaged and rusted exterior metal panels. Re-seal the building envelope by checking fasteners and flashings for tightness and seal on the walls, repair or replace as needed.
- Add additional pole lighting in the bus parking lot.
- Replace Gutters and downspouts.
Athletics and Concessions
- No Projects
New Elementary (2014)
- Visible bubbling, ponding and tears in the single-ply roof system visible. District should resolve issues with drainage and bubbling and replace damaged sections.
- Replace damaged and deteriorated sealants around skylights and replace damaged fasteners and metal edging.
High School/Auditorium/Gym
- Metal roof system is at the end of its useful life. Evaluate for repair and topcoat options to extend the life of the system; if cost is over 50% of new replacement should be considered. Check fasteners and flashings on roof system for tightness and seal, repair or replace as needed.
- Gutter and downspouts
Ag./CTE Bld.
- Replace damaged and deteriorated exterior metal panels, sealants and fasteners. Paint the exterior of the wood shop and classroom building. Enclose the remaining sides of the Ag barn where animals are stored to secure interior spaces.
- Insulation Replacement
DAEP
- Clean and repaint exterior CMU blocks; replace any deteriorated mortar at the time of refinishing. Replace all building seam calking.
Additional Projects, if Funds Become Available
Admin, Elementary and MS
- Replace metal roof awnings on the east side of the facility and metal roof coverings adjacent to HVAC units.
- Replace exterior metal panels around the perimeter of the facility.
- Re-seal the building envelope by regrouting or repointing the masonry work and replacing cracking or missing expansion joint caulking as needed.
- Update steel frame single pane window systems with energy efficient windows systems.
- Refresh exterior door finishes and replace weatherstripping and door sweeps on exterior doors as needed. Replace non-functioning doors and hardware as needed for proper operation
- Repair cracking and gaps in masonry wall structure; observe for movement.
- Refresh finished door surface as needed. Repair or replace damaged, weakened, and delaminating interior doors.
- Replace damaged hardware on metal doors and paint.
- Replace damaged hardware on storefront doors.
- Repair CMU wall surface and refresh finished surfaces.
- Repair wall surface and refresh finished surfaces.
- Repair or replace damaged and missing interior ceramic wall tiles, regrout and reseal as needed.
- Deep clean, repair or replace aged and damaged soft surface flooring.
- Repair or replace damaged vinyl floor tiles.
- Repair cracking of finished concrete surfaces and re-seal where needed.
- Repair or replace damaged ceramic tiles, regrout, and reseal as needed.
- Replace all damaged, stained and sagging ceiling tiles and areas where the grid system is missing or deteriorated.
- Replace tectum ceiling tiles that are stained or damaged.
- Clean and refresh open structure ceiling finished surfaces in gyms.
- Repair, replace, or re-install damaged and missing non-ADA compliant plumbing fixtures as needed.
- Electrical systems 30 years or older should be inspected and repaired or replaced as inspection dictates; Ongoing issues reported with current control system.
- Install clay traps under sinks in art room.
- Replace all damaged and deteriorated restroom stalls, doors and hardware, as well as any damaged and missing dispensers and mirrors.
- Repair or replace aged or damaged lockers, cabinets, and countertops as needed.
- Replace damaged moveable furnishings as needed.
- Elementary art room addition.
- Junior High Locker Rooms
- Roof access ladder
- Middle school weight room addition.
- Food Service Office
- Classroom Addition
Technology
- Replace sections of exterior metal panels where patched. Re-seal the building envelope by checking fasteners and flashings for tightness and seal on the walls, repair or replace as needed. Refresh finish surface.
- Refresh exterior door finished surfaces as needed and replace weatherstripping and door sweeps.
- Replace damaged interior doors and hardware as needed for ADA compliance. Refresh finish surfaces and door frames.
- Repair damaged wallboard and texture and paint interior wall surfaces.
- Deep clean, repair or replace aged and damaged soft surface flooring.
- Replace damaged and deteriorated vinyl floor tiles.
- Repair damaged wallboard and texture and paint interior ceiling surfaces.
- Replace stained, sagging and damaged ceiling tiles and sections of grid system.
- Replace stained, sagging and damaged ceiling tiles and sections of grid system. Recommend replacing ceiling tiles with a 2x2' system.
- Repair, replace, or re-install damaged and missing non-ADA compliant plumbing fixtures as needed. Recalk around sinks.
- Update lighting systems to LED.
- Install lighting control system.
- Replace damaged moveable furnishings as needed.
- CTE Lab Renovation
- Culinary refrigeration unit.
- Technology Storage
Maintenance
- Replace damaged garage door panels, hardware and frame.
- Replace non-ADA compliant door hardware and refresh finishes.
- Replace non-ADA compliant door hardware and refresh finishes.
- Replace flooring in restrooms where damaged or deteriorated.
- Clean and reseal concrete flooring in shop area.
- Replace stained, sagging and damaged ceiling tiles and grid system.
- Repair, replace, or re-install damaged and missing non-ADA compliant plumbing fixtures as needed.
- Install sprinkler system.
- Update lighting to LED.
- Install access control system.
- Repair or replace aged or damaged lockers, cabinets, and countertops as needed.
- Replace damaged moveable furnishings as needed.
- Install covered bus parking
- Maintenance Shop addition
- Central District Storage
- Drainage Inlet/Outlet repair
- District Drainage Grading
Athletics and Concessions
- Roof system on the storage facility adjacent to the football field (Old Weight Room) is original to the building (1995) and has reached the end of its useful life cycle. District should consider replacement in the next 1-3 years. Replace all missing and damaged metal roof fasteners and sealants. Recommend manufacturer-recommended maintenance be implemented.
- Repair damaged in foundation in Field House.
- Clean steel wall panel surface, remove any oxidation, apply rust inhibitor, recalk penetrations, and refresh finished surface or replace wall panel to reseal building envelope.
- Replace building seam calking.
- Replace door hardware for ADA accessibility using a district master restricted keyway system, and refresh finish surfaces.
- Replace damaged metal door panels and hardware and refresh exterior finishes as needed.
- Replace damaged and deteriorated interior metal doors, frames and hardware. Refresh surface finishes.
- Repair and repaint interior CMU surfacing.
- Repair damaged wallboard and surfacing and paint.
- Replace damaged metal panels and refresh finished surfaces.
- Repair cracking in concrete flooring, clean and seal in restrooms and field house.
- Repair damaged wallboard finish and paint.
- Paint interior ceiling structure where finish deteriorated.
- Repair, replace, or re-install damaged and missing non-ADA compliant plumbing fixtures as needed.
- Update lighting to LED.
- Incorporate the Field House facility into central data and communication system.
- Install access control on the Field House.
- Install a lighting control system in the Field House.
- Replace damaged and deteriorated shelving and built-in lockers.
- Replace damaged and deteriorated moveable furniture and lockers.
- Pave roadway between fields and the storage building.
- Install irrigation system on the competition football field.
- Insall additional lighting.
- Replace bleachers at the football field on visitor side. Funding for further erosion control measures included with HS Dashboard.
- Recrown, replace grass, replace curb and install irrigation on football field.
- Replace lighting at football field. Add additional lighting adjacent to the practice field.
- Replace football scoreboard.
- Grade field for erosion and replace grass turf.
- Grade field for erosion and replace grass turf.
- Add bleacher seating adjacent to tennis courts.
- Replace curb system along track.
- Apply a structural topcoat to track system.
- Practice field storage
- Artificial Turf Football Field
- Baseball Press Box
- Softball Press Box.
- Artificial Softball Turf
- Artificial Baseball Turf
- Covered practice area
New Elementary (2014)
- Clean and re-seal the metal exterior panels by checking fasteners and flashings for tightness and seal on the walls, repair or replace as needed.
- Re-seal the building envelope by replacing cracking or missing door, window, and expansion joint caulking as needed.
- Replace damaged and stained ceiling tiles.
- Replace damaged and deteriorated sections of playground equipment.
- Playground canopies
- Science Classrooms
- Kitchen addition
High School/Auditorium/Gym
- Repair the sections of the Mod-Bit roof system that are bubbling and showing signs of visible ponding.
- Single ply roof system over the new HS and auditorium has visible ponding and bubbling. System is reaching the end of its useful life cycle and large-scale repairs and patching could extend existing roofing system's life but if cost is over 50% of new replacement should be considered.
- Replace the damaged sealants around the roof hatch and install OSHA safety systems.
- Check fasteners and flashings for tightness and seal on exterior metal walls, repair or replace as needed. Power wash exterior to remove debris build-up.
- Replace broken or cracked masonry units. Re-seal the building envelope by replacing cracking or missing calking around doors, windows, and in expansion joints as needed.
- Update single pane window systems that have aged past their useful life with energy efficient windows systems. Paint metal window frames at the Gym building and replace all gaskets and caulking that have deteriorated.
- Paint exterior metal doors and replace weatherstripping and door sweeps as needed. Replace non-functioning doors and hardware as needed for proper operation.
- Repair cracks and gaps in CMU wall structure in Band Hall where cracked; observe for movement. If movement persists engineering study is recommended to determine cause and mitigation.
- Repair or replace damaged, weakened, and delaminating interior doors. Update interior door hardware to ADA compliant hardware as needed.
- Paint interior masonry surfaces.
- Replace damaged sections of wallboard, repair damaged texture and paint.
- Replace wood paneling wall finish.
- Repair or replace damaged and missing interior ceramic wall tiles, regrout and reseal as needed.
- Replace damaged sections of carpeted flooring.
- Replace damaged, stained and deteriorated vinyl floor tiles.
- Deep clean, reseal surface cracking, and refresh finished floor surface on polished concrete flooring.
- Repair or replace damaged ceramic tiles, regrout, and reseal as needed.
- Repair damaged sections of wallboard ceilings, retexture and paint.
- Replace all stained, sagging and otherwise damaged ceiling tiles and sections of grid system. Recommend replacing 2x4' system with a 2x2' system.
- Replace all stained, sagging and otherwise damaged ceiling tiles and sections of grid system. Recommend replacing 2x4' system with a 2x2' system.
- Repair, replace, or re-install damaged and missing non-ADA compliant plumbing fixtures as needed.
- Update interior lighting systems to LED in the classrooms and auditorium.
- Review system, update cabling, provide additional storage and update devices as needed.
- Install lighting control system in classroom wings and auditorium.
- Update science lab stations and equipment.
- Update stage lighting, curtains, control, and sound system.
- Replace damaged restroom accessories, including mirrors and soap dispensers, and stalls.
- Repair or replace aged or damaged lockers, cabinets, and countertops as needed.
- Replace damaged moveable furnishings as needed.
- Repair damaged roadways, restripe bus lanes and pick up lanes. Information for the district.
- Add additional parking lots adjacent to sports fields. Repair damaged parking lots, restripe, add appropriate ADA Van spaces and ADA signage. Information for the district.
- Replace damaged sections of pedestrian paving where cracked or heaving. Information for the district.
- Replace damaged metal canopy panels and paint. Information for the district.
- Replace damaged and deteriorated covers on exterior lighting.
- Library addition
- Kitchen addition.
- Workroom addition.
- Multi-Media classroom
Ag./CTE Bld.
- Metal roof over the classrooms and wood shop is original to the facility and has reached the end of its useful life cycle. It was coated in 2022 to prolong life but district will need to consider replacement in the next 5-10 years. Pricing for roof replacement.
- Replace window units in the wood shop.
- Paint exterior metal doors at the classroom and woodshop buildings. Replace any damaged weather striping and hardware.
- Replace deteriorated and damaged metal panels and hardware on overhead garage doors at the wood shop. Add overhead garage door to Ag barn after enclosed.
- Replace interior doors and hardware as needed for ADA compliance and refresh finish surfaces.
- Paint interior metal doors and replace damaged hardware.
- Repair damaged sections of CMU wall surfaces and paint.
- Paint interior metal wall panels where finish deteriorated.
- Replace damaged and stained vinyl floor tiles.
- Clean, repair cracks and reseal concrete flooring in shop areas.
- Replace damaged, stained and sagging ceiling tiles and sections of grid.
- Paint open structure components.
- Replace damaged and deteriorated plumbing fixtures and drinking fountains.
- Update lighting systems to LED units.
- Update to fiber cabling and devices to support secure Wi-Fi as needed.
- Install lighting control system.
- Repair or replace aged or damaged lockers, cabinets, and countertops as needed.
- Replace damaged moveable furnishings as needed.
- Replace damaged sections of fencing and privacy inserts.
- Install metal canopy to cover exterior shop spaces.
- Install additional pole lighting in the northside parking lot.
- Replace Gutters and downspouts
- Classroom and office addition
- AG barn expansion.
- CTE Classroom addition.
- Central Office
- Floral Fridge
- Paint Boot Relocation
- Livestock Equipment Storage
- Shop Material Storage
- Student Restrooms with Lockers
- Welding Booth Addition
- CNC Office
DAEP
- Metal panels on perimeter are original to the facility and should have repairs and replacements completed to ensure further deterioration.
- Replace damaged decorative metal perimeter panels, sealants and fasteners and paint.
- Paint exterior metal doors and replace deteriorated weather stripping and door hardware.
- Paint interior CMU where finish had deteriorated.
- Replace damaged and stained ceiling tiles.
Completed Projects
Admin, Elementary and MS
- No Projects
Technology
- No Projects
Maintenance
- No Projects
Athletics and Concessions
- No Projects
New Elementary (2014)
- No Projects
High School/Auditorium/Gym
- No Projects
Ag./CTE Bld.
- No Projects
DAEP
- No Projects
Facility Dashboard, and its Facility Condition Assessment (“FCA”) assumes “like for like” system(s). It does not take into consideration design changes or code upgrades. The Facility Condition Index (FCI) is a standard facility metric that evaluates a facilities identified deficiencies against the replacement cost of the entire facility to arrive at a replacement cost ratio. Our cost estimates are in current day dollars and should be used for planning purposes only. We encourage and recommend review and updating of your construction scope and estimates prior to seeking funding.