Lyford CISD - Main Campus - Lyford High School & Middle School and Ag. Barn
Main Campus - Lyford High School & Middle School and Ag. Barn



Facility Scorecard
Executive Summary
Built in 1982 with additions in 1989 and 1999, the Lyford High School facility is in fair condition, but is in need of maintenance and repair to various building components. The 1982 structure needs professional evaluation and repair, the roof should be replaced due to age and substantial deterioration, and older HVAC system components should be addressed at the time of replacement. The Lyford Middle School Facility was built in 1999 and in overall good to fair condition. Minor maintenance and repair of various building components are needed. In all, the interior of the facility is in fair to good condition and provides a well-maintained educational environment that is conducive to learning. With the structural and foundation issues, age of the buildings, and the needed maintenance and repair work, the district should consider the cost to repair in light of the cost to replace the 1982 HS building.