Priority Projects
Main Campus - Lyford High School & Middle School and Ag. Barn
- Additional perimeter and pole lighting needed around campus.
- Replace damaged roof coverings.
- Repair damaged brick on exterior walls.
- Recaulk around exterior door and window frames.
- Replace all non-ADA compliant hardware.
- Replace all wooden exterior doors with metal and repaint.
- Cafeteria kitchen expansion.
Lyford Elementary School
- Additional pole and perimeter lighting around the campus.
- Repair and topcoat parking lots and drives.
- Replace HVAC components that are past useful life cycle.
Main Campus - Child Care Buildings
- Repair all cracks in exterior masonry walls; a structural evaluation of each building should be completed.
- Add additional perimeter and site lighting.
- Address all non-ADA compliant fixtures and door hardware.
Main Campus - Staff Development Building
- Repair all cracks in exterior masonry walls; a structural evaluation of each building should be completed.
- Add additional perimeter and site lighting.
- Address all non-ADA compliant fixtures and door hardware.
Main Campus - Administration, Annex, Police, Travis ES, Media Center
- Repair all damage to exterior surfaces; structural evaluation of buildings should be completed.
- Replace all non-ADA complaint hardware.
- Replace all roofing systems that are at the end of their useful life.
- Replace all HVAC systems and supporting electrical components nearing the end of their useful life.
Main Campus - Auditorium
- Repair all damage to exterior surfaces; structural evaluation of buildings should be completed.
- Replace all non-ADA complaint hardware.
- Replace roofing system and evaluate wooden substructure for damage.
- Replace all HVAC systems and supporting electrical components nearing the end of their useful life.
Main Campus - 1923 Building
- Repair all damage to exterior surfaces; structural evaluation of buildings should be completed.
- Replace all non-ADA complaint hardware.
- Replace roofing system.
Main Campus - Maintenance, Transportation & Grounds Buildings
- Add additional site and perimeter lighting.
- Replace roof systems that are past their useful life.
- Replace all non-compliant door hardware.
Main Campus - Athletics and Veterans Gym
- Repair cracks in mortar using tuck and point and recaulk exterior building seams.
- Fencing should be installed to secure fields and other grounds used during school hours.
- Replace all damaged and non-compliant stalls and fixtures in restrooms.
Sebastian ES & Cavazos Center
- Roofs are at the end of their useful life and should be replaced; at the time of replacement, roofing substructure should be evaluated.
- Security enhancements should be made to each building and the campus grounds.
- Security fencing should be installed around the campus perimeter.
- Plumbing and electrical systems older than 30 years should be evaluated and considered for replacement.
- Water damaged electrical systems should be replaced.
- Damaged interior finishes and furnishings should be replaced.
- ADA improvements should be made to each campus and pathways between buildings.
Additional Projects, if Funds Become Available
Main Campus - Lyford High School & Middle School and Ag. Barn
- Parking expansion.
- Repair and repaint all canopy poles and structural elements.
- Structural study of 1982 HS Building foundation.
- Cafeteria expansion.
- Plumbing and electrical systems are over 30 years old and should be considered for replacement.
- Furniture replacement and enhancement should be considered at funding is available.
- Repair and refinish roadways and parking lots.
- Replace interior and exterior lighting with LED.
Lyford Elementary School
- Additional playground fall material.
- Cafeteria kitchen expansion.
- Library expansion.
- Replace damaged flooring.
- Repaint interior and exterior doors and repair damaged frames.
- Replace caulking around exterior windows and door frames.
- Repair damaged playground equipment and add additional fall material.
Main Campus - Child Care Buildings
- Power lines underground.
- Additional fall material at playground.
- Add additional fall material and a shade canopy to playgrounds.
- Replace all damaged floor and wall materials.
- Repaint interior surfaces.
- Replace ceiling grid system with 2'x2' size tiles.
- Recaulk around exterior windows.
- Replace damaged exterior doors.
- Add keyless entry to access points.
Main Campus - Staff Development Building
- Structural evaluation.
- Power lines underground.
- Add additional fall material and a shade canopy to playgrounds.
- Replace all damaged floor and wall materials.
- Replace ceiling grid system with 2'x2' size tiles.
- Recaulk around exterior windows.
- Replace damaged exterior doors.
- Add keyless entry to access points.
Main Campus - Administration, Annex, Police, Travis ES, Media Center
- Bury overhead power lines.
- Rekey district.
- Replace all damaged floor and wall finishes.
- Replace all exterior window systems.
- Add additional pole and perimeter lighting.
- Consider replacing all electrical and plumbing infrastructure that is 30 years or older.
- Rekey district to minimize master keys and add keyless entry.
Main Campus - Auditorium
- Bury overhead power lines.
- Structural evaluation.
- Replace all damaged floor and wall finishes.
- Add additional pole and perimeter lighting.
- Consider replacing all electrical and plumbing infrastructure that is 30 years or older.
Main Campus - 1923 Building
- Bury overhead power lines.
- Additional pole lighting.
- Replace all damaged floor and wall finishes.
- Replace all exterior window systems.
- Add additional pole and perimeter lighting.
- Consider replacing all electrical and plumbing infrastructure that is 30 years or older.
Main Campus - Maintenance, Transportation & Grounds Buildings
- Replace all damaged floor materials.
- Replace all damaged interior and exterior doors.
- Consider replacing infrastructure that is older than 30 years.
- Upgrade interior and exterior lighting to LED.
Main Campus - Athletics and Veterans Gym
- Repaint all interior and exterior surfaces.
- Consider replacing all plumbing and electrical infrastructure that is older than 30 years.
- Replace all damaged flooring.
- Replace all wooden exterior doors with metal.
- Replace all non-compliant hardware and repaint.
- Roof systems nearing the end of useful life and in need of replacement.
- Replace all damaged lockers and built in furniture.
Sebastian ES & Cavazos Center
- Repaint interior and exterior surfaces.
- Parking lot and driveway asphalt needs renovation.
Completed Projects
Main Campus - Lyford High School & Middle School and Ag. Barn
- No Projects
Lyford Elementary School
- No Projects
Main Campus - Child Care Buildings
- No Projects
Main Campus - Staff Development Building
- No Projects
Main Campus - Administration, Annex, Police, Travis ES, Media Center
- No Projects
Main Campus - Auditorium
- No Projects
Main Campus - 1923 Building
- No Projects
Main Campus - Maintenance, Transportation & Grounds Buildings
- No Projects
Main Campus - Athletics and Veterans Gym
- No Projects
Sebastian ES & Cavazos Center
- No Projects
Facility Dashboard, and its Facility Condition Assessment (“FCA”) assumes “like for like” system(s). It does not take into consideration design changes or code upgrades. The Facility Condition Index (FCI) is a standard facility metric that evaluates a facilities identified deficiencies against the replacement cost of the entire facility to arrive at a replacement cost ratio. Our cost estimates are in current day dollars and should be used for planning purposes only. We encourage and recommend review and updating of your construction scope and estimates prior to seeking funding.