Priority Projects

Administration

  • Repair cracking in masonry and mortar.
  • Replace caulking in building seams.
  • Repaint interior masonry surfaces.
  • Replace stained and damaged ceiling tiles.
  • Replace damaged or deteriorated plumbing fixtures.
  • Replace 5 out of 7 HVAC units.
  • Repair damaged parapet and soffits.Library addition.Landscaping.
  • Replace non-ADA compliant door hardware.
  • Repave and paint parking lots and drives.
  • Replace damaged accessories in restrooms.
  • Replace damaged and mismatched furnishings.
  • Replace damaged and non-ADA compliant portions of pedestrian pathways.
  • Replace all wooden exterior doors with metal doors.
  • Recalk around door frames and windows.Address all safety and security recommendations.

Elementary School & Junior High

  • Replace damaged exterior doors.
  • Repaint and replace non-ADA compliant hardware.
  • Replace stained and damaged flooring.
  • Repair minor cracking in concrete flooring, clean and reseal.
  • Replace all plumbing fixtures that are damaged or non-ADA compliant.
  • Repair cracks in masonry walls inside and outside and repaint.
  • Replace damaged wood paneling and gypsum wallboard.
  • Replace damaged portions of exterior metal panels.
  • Provide adequate fall material under playgrounds.
  • Address all safety and security recommendations.

High School, VoAg, Athletics and Maintenance

  • Repair all damaged bricks and metal panels on exterior of buildings.
  • Replace damaged roofs and adjacent drainage systems.
  • Replace damaged or non-ADA compliant door hardware and plumbing fixtures.
  • Additional pole and perimeter lighting.
  • Gutters and downspouts.
  • Splashpads.
  • Address all safety and sercurity recommendations.

Additional Projects, if Funds Become Available

Administration

  • Library addition.
  • Secure Vestibule.
  • Landscaping.
  • Building connectors.
  • Re-key district.
  • Administration addition.
  • Bus canopies.
  • Drainage Evaluation.
  • Drainage Repairs.
  • Install lighting control sensors.
  • Repaint interior door surfaces.
  • Replace damaged and stained carpet.
  • Replace damaged floor tile.

Elementary School & Junior High

  • Kitchen addition.
  • Nurse addition.
  • Life skills addition.
  • Additional perimeter lighting.
  • Playground canopy.
  • Playground repairs.
  • Lounge/Workroom addition.
  • Fall zone updates.
  • ES/JH Gym Flooring.
  • Kitchen addition.
  • Nurse addition.
  • Life skills addition.
  • Lounge/Workroom addition.
  • Additional perimeter lighting.
  • Playground canopy.
  • Replace all window units.
  • Evaluate and consider replacing all electrical systems that are older than 30 years.
  • Upgrade Fire Control Panel and integrate into ALC controls system.
  • Install lighting control sensors.
  • Replace damaged restroom accessories and stalls.
  • Replace damaged and mismatched furnishings and lockers.
  • Replace stained and damaged ceiling tiles with a 2x2' grid system.
  • Repaint metal ceiling structure in gym.
  • Repair and paint metal playground equipment.

High School, VoAg, Athletics and Maintenance

  • Additional pole lighting.
  • Structural evaluation.
  • Move powerlines under ground.
  • Additional perimeter lighting.
  • Gutters and downspouts.
  • Splashpads.
  • Power washing.
  • Locker room renovation.
  • Paint handrails.
  • Football scoreboard.
  • Staff restroom addition.
  • Lounge/Workroom addition.
  • Tennis court.
  • Stadium bleachers.
  • Baseball and softball bleachers.
  • Elevator.
  • Fire escape.
  • Replace all stained or damaged wall, ceiling and floor materials.
  • Structural evaluation of HS building.
  • Replace all HVAC units that have passes their useful lifespan.
  • HVAC control upgrades and testing & balancing should be performed during HVAC replacement.
  • Replace non-functional equipment and furnishings for Science, VoAg and Arts programs.
  • Replace damaged and non-ADA compliant restroom stalls and accessories.
  • Replace damaged furnishings.
  • Upgrade Fire Control Panel and integrate into ALC controls system.
  • Replace window units.
  • Structural evaluation.
  • Move power lines underground.
  • Power washing.
  • Locker room renovation.
  • Paint handrails.
  • Football scoreboard.
  • Staff restroom addition.
  • Lounge/Workroom addition.
  • Tennis court.
  • Stadium bleachers.
  • Baseball and softball bleachers.
  • Elevator or fire escape for 2nd floor locker rooms.

Completed Projects

Administration

  • No Projects

Elementary School & Junior High

  • No Projects

High School, VoAg, Athletics and Maintenance

  • No Projects

Facility Dashboard, and its Facility Condition Assessment (“FCA”) assumes “like for like” system(s). It does not take into consideration design changes or code upgrades. The Facility Condition Index (FCI) is a standard facility metric that evaluates a facilities identified deficiencies against the replacement cost of the entire facility to arrive at a replacement cost ratio. Our cost estimates are in current day dollars and should be used for planning purposes only. We encourage and recommend review and updating of your construction scope and estimates prior to seeking funding.