Priority Projects

Main Campus - Main School and Ag. Shop

  • Replace damaged and deteriorated exterior metal panels.
  • Replace all sealants and missing fasteners and paint.
  • Replace all building seam calking and power wash exterior surfaces.
  • Replace single-ply roof system on main building.
  • Replace metal roofing system.
  • Replace damaged restroom stalls and accessories.
  • Repaint exterior metal doors and replace damaged and non-ADA compliant hardware.
  • Replace damaged frame and door to the mechanical room.

Main Campus - Special Pgm., Band, Bus Barn, Ag Barn, Field House and Gym (2000)

  • Paint exterior of the concessions building.
  • Replace building seam calking on concessions and storage facilities.
  • Replace damaged wood siding and soffit on Support Programs bld.
  • and concessions building.
  • Replace all damaged exterior metal panels and missing fasteners and calking.
  • Replace building seam caulking.
  • Replace all damaged, non-functioning and non-ADA plumbing hardware and fixtures.
  • Replace roof systems, including soffits and fascia on the support services building, Field house, band hall, concessions and press box.
  • Replace all damaged metal panels and adjacent systems on the gym and bus barn.
  • Perform manufacturer-recommended maintenance.
  • Install ADA compliant pathways around and into facilities.
  • Replace non-ADA compliant hardware and plumbing fixtures.
  • Replace all damaged and deteriorated exterior metal doors and frames.
  • Paint doors in fair condition and replace damaged hardware.
  • Re-calk around all exterior doors.

Main Campus - 1937 Gym

  • Repair cracking in exterior masonry walls.
  • Replace all plumbing fixtures.
  • Replace calking and missing fasteners on roof system.
  • Perform manufacturer-recommended maintenance.
  • Replace all restrooms stalls and accessories.
  • Replace all wood exterior doors with metal.
  • Replace all exterior metal doors and frames.
  • Replace wood doors and frames and all door hardware that is not ADA compliant.

Additional Projects, if Funds Become Available

Main Campus - Main School and Ag. Shop

  • Replace playgrounds, canopy and fall material.
  • Campus signage.
  • Paint exterior handrails.
  • Replace all damaged gutters and downspouts.
  • Install perimeter lighting.
  • Nurse addition.
  • Kitchen addition.
  • Library addition.
  • Cafeteria addition.
  • Lounge/workroom addition.
  • Loading dock canopy.
  • Replace Ag shop insulation.
  • Install ventilation system in Ag. shop.
  • Covered walkways.
  • Replace all damaged portions of stairs and handrails.
  • Replaced damaged sections of wallboard and repaint all interior wallboard surfaces.
  • Replace all ceiling tiles and grid systems.
  • Paint visible interior structure.
  • 9 out of 27 HVAC units (26% cooling capacity) have aged past their useful life span and should be replaced.
  • Update duct work, web-based energy management system, test, and balance new HVAC units when installed.
  • Install web-based energy management system.
  • Test and balance new HVAC units when installed.
  • Replace all damaged and non-ADA compliant restroom hardware.
  • Plumbing systems 30 years or older should be inspected and repaired or replaced as inspection dictates.
  • Replace existing roadways and parking lots, restripe, and add signage.
  • Designate separate areas for drop-off and pick-up for bus and car riders.
  • Kitchen is undersized and equipment should be replaced and updated.
  • Upgrade workstations and sink.
  • Repair or replace aged or damaged lockers, cabinets, and countertops as needed.
  • Replace damaged moveable furnishings as needed.
  • Replace damaged sections of walkways and ramps.
  • Replace and add additional perimeter fencing and gates.
  • Replace all exterior pole lighting with LED units.
  • Mechanical systems 30 years or older should be inspected and repaired or replaced as inspection dictates.
  • Install LED lighting.
  • Install data system.
  • Incorporate both facilities into central communication system.
  • See Safety & Security recommendations on the Facility Details page.
  • Install lighting control system.
  • Replace damaged metal door panels and hardware.
  • Replace damaged wood door and all non-ADA compliant and damaged hardware.
  • Repair damaged metal roll-up door panels and paint.
  • Replace damaged hardware.
  • Replace damaged metal doors and frames in shop.
  • Replace all exterior window units.
  • Replace stained and damaged sections of carpeted flooring.
  • Abate and replace all vinyl flooring.
  • Clean and reseal all concrete flooring.
  • Replace damaged ceramic flooring and deteriorated grout.
  • Replace playgrounds, canopy and fall material.
  • Campus signage.
  • Paint exterior handrails.
  • Replace all damaged gutters and downspouts.
  • Install perimeter lighting.
  • Nurse addition.
  • Kitchen addition.
  • Library addition.
  • Cafeteria addition.
  • Lounge/workroom addition.
  • Loading dock canopy.
  • Replace Ag Shop Insulation.
  • Install ventilation system in Ag shop.

Main Campus - Special Pgm., Band, Bus Barn, Ag Barn, Field House and Gym (2000)

  • Replace tennis courts.
  • Replace gutters and downspouts.
  • Track Restroom and concessions facility.
  • Replace insulation in field house building.
  • Repair football stadium bleachers.
  • Replace scoreboards at Elk Stadium and add scoreboards at track facility.
  • Replace track.
  • Replace stadium lighting with LED fixtures and add additional units.
  • Install bleachers.
  • Install restrooms in Band hall.
  • Gym bleacher repair.
  • Football stadium storage facility.
  • Repaint interior CMU surfaces.
  • Repair damaged wallboard and paint.
  • Replace damaged interior wood paneling wallboard in Field House and paint all surfaces.
  • Replace damaged and stained ceiling tiles and missing grid system.
  • Consider replacing system with 2x2 grid system.
  • Paint exposed structural components in Gym and Field house.
  • Replace plumbing systems that are over 30 years old, or non-functioning and install missing systems in student/staff occupied facilities.
  • Replace HVAC units at or past their useful life expectancy.
  • Update duct work as needed when HVAC units are replaced.
  • Install web-based energy management system.
  • Test and balance new HVAC units when installed.
  • Update duct work, web-based energy management system, test, and balance new HVAC units when installed.
  • Replace roadways and parking lots, restripe, and add signage.
  • Elk Stadium and track facilities information.
  • Replace damaged restroom and locker room accessories, including stall dividers, dispensers, and mirrors.
  • Repair or replace aged or damaged lockers, cabinets, and countertops as needed.
  • Replace damaged moveable furnishings as needed.
  • Replace damaged pedestrian pathways and add ADA compliant routes at the football stadium and the track facility.
  • Replace perimeter fencing and gates at Elk Stadium and track facilities.
  • Install irrigation system at football, softball, and baseball fields.
  • Replace pole lighting at the Elk Stadium and Track facilities with LED.
  • Mechanical systems 30 years or older should be inspected and repaired or replaced as inspection dictates.
  • Install LED lighting.
  • Update to fiber cabling and devices to support secure Wi-Fi as needed.
  • Incorporate Field house and Main Gym into central communication system.
  • Install lighting control system at the Special Programs bld, Gym, Filed House, and Band Hall.
  • Install vape detectors in restrooms at Gym and Field house.
  • Replace damaged overhead metal garage doors and hardware at Ag barn Install rollup metal doors at concession windows at Elk Stadium and Track facilities.
  • Replace damaged and missing interior wood doors and frames.
  • Replace all damaged and non-ADA compliant door hardware.
  • Replace damaged metal door panels and hardware.
  • Paint all interior metal doors.
  • Replace all exterior window units on the Support Programs building and Field House.
  • Replace damaged and stained carpet in Special Programs classrooms.
  • Replace all damaged and deteriorated vinyl flooring.
  • Patch and reseal all concrete flooring.
  • Repair damaged sections of wood flooring and refinish.
  • Replace tennis courts.
  • Replace gutters and downspouts.
  • Track Restroom and concessions facility.
  • Replace insulation in field house building.
  • Repair football stadium bleachers.
  • Replace scoreboards at Elk Stadium and add scoreboards at track facility.
  • Replace track.
  • Replace stadium lighting with LED fixtures and add additional units.
  • Install bleachers.
  • Install restrooms in Band Hall.
  • Gym bleacher repair.
  • Football stadium storage facility.
  • See Safety & Security recommendations on the Facility Details page.

Main Campus - 1937 Gym

  • Install gutters and downspouts.
  • Structural evaluation.
  • Retention wall repairs.
  • Install HVAC system.
  • Grade exterior for drainage.
  • Replace damaged wood flooring components.
  • Replace wooden staircase and handrails.
  • Repair damaged masonry surfaces and paint.
  • Replace damaged wallboard surfaces.
  • Replace wood paneling surfaces.
  • Replace vinyl wallboard paneling.
  • Replace all ceiling tiles and grid systems.
  • Paint all visible structural components on the ceiling.
  • Plumbing systems over 30 year of age should be inspected closely and considered for replacement.
  • Replace all stage lighting and equipment.
  • Replace bleachers for functionality and ADA compliance.
  • Replace damaged moveable furnishings as needed.
  • Mechanical systems 30 years or older should be inspected and repaired or replaced as inspection dictates.
  • Install LED lighting.
  • Install data system.
  • Incorporate facility into central communication system.
  • See Safety & Security recommendations on the Facility Details page.
  • Install lighting control system.
  • Replace calking around window units.
  • Replace all carpeted flooring.
  • Patch cracks in concrete flooring and seal.
  • Replace damaged and missing ceramic floor tiles and deteriorated grout.
  • Install gutters and downspouts.
  • Structural evaluation.
  • Retention wall repairs.
  • Install HVAC system.
  • Grade exterior for drainage.

Completed Projects

Main Campus - Main School and Ag. Shop

  • No Projects

Main Campus - Special Pgm., Band, Bus Barn, Ag Barn, Field House and Gym (2000)

  • No Projects

Main Campus - 1937 Gym

  • No Projects

Facility Dashboard, and its Facility Condition Assessment (“FCA”) assumes “like for like” system(s). It does not take into consideration design changes or code upgrades. The Facility Condition Index (FCI) is a standard facility metric that evaluates a facilities identified deficiencies against the replacement cost of the entire facility to arrive at a replacement cost ratio. Our cost estimates are in current day dollars and should be used for planning purposes only. We encourage and recommend review and updating of your construction scope and estimates prior to seeking funding.