Priority Projects
Administration
- Evidence of possible foundation movement was observed; consider hiring an engineer to evaluate the building for future movement and possible corrective actions.
- Building mechanical systems 30 years of age or older should be closely inspected and repaired or replaced per report.
- HVAC system components at or beyond useful life expectancy should be replaced.
- Update HVAC system controls.
- Test and balance new HVAC systems.
- Update interior door hardware to maintain compliance with ADA and refinish interior doors.
- See Safety & Security recommendations on the Facility Details page.
- Install spill containment system and bollards to prevent accidental collisions with fuel tank.
- Replace ramp to Conference Portable to meet ADA compliance.
- Update womens staff restroom sink to meet ADA compliance.
- An accessible van space is needed in the parking lot.
Baseball and Softball Complex
- Replace restroom faucets and urinal to meet ADA compliance.
- ADA parking signage and accessories are needed.
- Completely remove and replace roofing system on softball press box.
- Concessions roof penetrations should be inspected for watertightness and reseal as necessary.
- Construct a backstop around the softball infield constructed of metal paneling to contain infield dirt on the infield.
High School - Ag Shop, Band Hall, Gym, Maintenance, and Trades
- See Safety & Security recommendations on the Facility Details page.
- Evidence of movement was observed at Ag Shop, Band Hall, Maintenance Building, and Trades Building; Consult with an engineer to determine cause and solutions for movement.
- Repair damaged brick and mortar.
- Identify source of moisture in Trades Building Mechanical Room and remediate.
- Replace damaged sink; replace outdated drinking fountains; and install additional drinking fountains.
- Building mechanical systems 30 years of age or older should be closely inspected and repaired or replaced per report.
- Replace HVAC system components at or beyond useful life expectancy; Replace HVAC ductwork as needed after HVAC replacement; Replace HVAC controls and instrumentation; Test and balance new HVAC systems.
- Trees need to be trimmed away from roofs.
- Clean out gutters of debris.
- Inspect and repair caulkings on Band Hall roof.
- Significant mechanical and electrical upgrades are needed to bring the vocational building to a like new condition; including new electrical systems, LED lighting, and ventilation system for welding stations.
- Remove items stored in electrical and mechanical rooms, maintaining access to electrical panels.
- Replace exterior wooden doors with metal doors.
- Refinish exterior doors and update door hardware to meet ADA compliance.
- Enclose walkways.
Elementary School - 200 Wing
- Investigate possible foundation movement; consider hiring an engineer to evaluate possible causes and solutions.
- Replace HVAC system components at the end of useful life expectancy; test and balance new HVAC systems; and upgrade HVAC controls and instrumentation.
- Inspect and reseal roof vents.
- Replace door weather stripping.
- See Safety & Security recommendations on the Facility Details page.
Elementary School - ES Admin and 400 Wing
- See Safety & Security recommendations on the Facility Details page.
- Replace plumbing fixtures and update restrooms in 400 SPED to meet ADA compliance.
- Building mechanical systems 30 years of age or older should be closely inspected and repaired or replaced per report.
- Replace HVAC system components at or beyond useful life expectancy.
- Replace ductwork as needed with new HVAC systems.
- Replace HVAC controls and instrumentation.
- Test and balance new HVAC systems.
- Replace water supply lines and sewer lines as needed by inspection report.
- Roofs are in good condition, trees should be trimmed away from roofs to prevent pest access.
- ADA updates are needed; additional accessible signage, fence handle, and door hardware is needed.
- Construct enclosed walkways.
Elementary School - Multipurpose and Primary
- Inspect and repair exterior expansion caulking.
- Contract with an engineer to determine cause and solutions for possible foundation movement at Primary Building.
- Replace HVAC system components beyond useful life expectancy.
- Replace HVAC controls and instrumentation; Test and balance new HVAC systems.
- Inspect gutters and downspouts and repair or replace as necessary.
- Address drainage issues at Primary building; Area around building should be graded to direct water away from the building.
- Update lighting LED fixtures; Install lighting control system.
- Refinish interior and exterior doors and update door hardware to meet ADA compliance.
- See Safety & Security recommendations on the Facility Details page.
- Inspect and repair or replace exterior window caulking.
Football Athletics - Field House
- See Safety & Security recommendations on the Facility Details page.
- Trim trees away from building.
- Additional ADA parking spaces, parking signage, accessible signage, and door hardware is needed.
- Stripe parking lot near gym and allocate appropriate ADA parking spaces.
- Refinish exterior doors and replace exterior doors as necessary.
High School - Main & Lab Buildings
- See Safety & Security recommendations on the Facility Details page.
- Inspect expansion caulking on tilt wall construction and repair as necessary.
- Building mechanical systems 30 years of age or older should be closely inspected and repaired or replaced per report.
- Replace HVAC system components beyond useful life expectancy; Update HVAC controls and instrumentation; Test and balance after installing new HVAC systems.
- Install three drinking fountains to meet code and ADA compliance.
- Inspect and repair gutter and downspout systems to keep water from the roof away from building.
- Make ADA updates including additional ADA parking spaces; parking signage; accessible signage; and updating to compliant door hardware.
- Replace both kitchen walk-ins per staff report.
- Remove items blocking electrical panels in electrical or maintenance rooms.
Transportation - Bus Building and Office
- See Safety & Security recommendations on the Facility Details page.
- Replace HVAC system components beyond useful life expectancy.
- Bus garage roof appears to be original and shows signs of significant corrosion and should be replaced.
- Repair soffit of office.
- Transportation facility is not compliant with ADA; Additional ADA parking spaces, parking signage, accessible signage, accessible restroom, door thresholds, and door hardware is needed.
- Install additional exterior light fixtures.
- Building mechanical systems 30 years of age or older should be closely inspected and repaired or replaced per report.
- Refinish exterior doors and update door hardware to meet ADA compliance.
Additional Projects, if Funds Become Available
Administration
- Restroom
- Ramp
- Vestibule
- Fuel
- Repair minor cracks in Administration exterior walls and repaint.
- Repair minor damage and repaint interior walls.
- Remove popcorn ceiling texture and repaint surface.
- Replace 2x4 drop ceiling tile with 2x2 ceiling tile system.
- Replace ductwork as necessary while updating HVAC systems.
- Inspect and repair conference portable gutters and downspouts.
- Reseal and restripe parking lot.
- Refinish cabinets.
- Update lighting to LED fixtures and consider replacing wiring.
- Install lighting control system with new LED lighting.
- Replace single pane windows with energy efficient double pane windows.
- Replace resilient floor tile.
Baseball and Softball Complex
- Softball field
- Baseball/Softball Field House
- Repaint exterior buildings and metal structures.
- Replace wooden steps on stairs to press box.
- Pave roadway to baseball and softball complex.
- Pave the parking lot and provide appropriate number of accessible parking spaces (1 per 25) and accessible van spaces (1 per 8 accessible spaces).
- Update interior lighting to LED fixtures.
- Replace wooden doors.
- Refinish exterior doors.
- See Safety & Security recommendations on the Facility Details page.
- Replace exterior windows with energy efficient double pane.
- Strip and re-apply liquid applied flooring in men's rest room in areas of damage.
- Construct a baseball and softball field house with concessions and restroom facilities in between the baseball and softball fields.
High School - Ag Shop, Band Hall, Gym, Maintenance, and Trades
- Auditorium
- Enclosed Walkways
- Repaint exterior metal paneling and masonry walls as needed.
- Patch, repair, and repaint interior walls.
- Replace 4x2 drop ceiling tile with 2x2 ceiling tile; Replace stained ceiling tiles.
- Make ADA updates as needed including accessible signage and door hardware.
- Update lighting to LED fixtures; Install lighting control system with new LED lighting.
- Adjust vocational rollup door to be easily opened by one person.
- Replace windows with energy efficient double pane windows.
- Thoroughly deep clean or replace carpeted flooring.
- Repair liquid applied flooring.
- Consider constructing a Fine Arts Facility.
Elementary School - 200 Wing
- Enclosed walkways
- Restroom addition
- Repair damaged grout and brick as necessary.
- Repaint exterior metal walls.
- Repaint interior walls.
- Building mechanical systems 30 years of age or older should be closely inspected and repaired or replaced per report.
- Repair damaged restroom stalls.
- Repair or replace moveable classroom furnishings as necessary.
- Update lighting to LED fixtures; and lighting control system.
- Replace door hardware and refinish exterior metal doors.
- Refinish interior doors as necessary.
- Update single pane windows to double pane energy efficient windows; At a minimum, replace broken windowpanes.
- Thoroughly clean floor and replace broken or missing floor tiles as necessary.
- Construct enclosed walkways in-between buildings.
Elementary School - ES Admin and 400 Wing
- Vestibule
- Sped Restrooms
- Enclosed Walkways
- Repaint interior wall finishes.
- Replace 2x4 ceiling tiles with 2x2 ceiling tile system.
- Resolve minor to moderate cracking with slurry coat and restripe parking lot.
- Replace furnishings as needed.
- Update lighting to LED fixtures; Install lighting control system.
- Replace single pane windows with double pane energy efficient windows.
- Thoroughly deep clean carpet or replace carpet.
- Deep clean floor tile and replace damaged flooring as needed.
- Replace floor tile in 400 building.
Elementary School - Multipurpose and Primary
- Vestibule
- Drainage
- Enclosed Walkways
- Prep and repaint exterior metal panels.
- Repair damaged masonry walls.
- Repaint high touch interior walls.
- Repaint multipurpose walls.
- Replace damaged ceiling tiles as needed.
- Update primary restrooms and hallways with an updated tile and color scheme.
- Repair damaged water fountain in Multipurpose building.
- Repair or replace damaged restroom accessories.
- Replace windows with double paned energy efficient windows.
- Clean floor tile and replace damaged flooring as needed.
- Clean ceramic tile and grout, repair damaged tiles.
- Construct enclosed walkways.
Football Athletics - Field House
- Touch up interior paint as necessary.
- Replace glued up ceiling tile with new ceiling finish.
- Building mechanical systems 30 years of age or older should be closely inspected and repaired or replaced per report.
- Update HVAC controls and instrumentation.
- Update remaining light fixtures to LED fixtures; update lighting control system.
- Replace older and worn carpet.
- Repair liquid applied flooring as necessary.
- Consider updating to a turf field.
High School - Main & Lab Buildings
- Vestibule
- Window film
- Auditorium
- Library
- Library renovation
- Refinish interior walls.
- Replace wood paneling.
- Replace 2x4 drop ceiling tile system with 2x2 ceiling tile system.
- Replace older 2x2 ceiling tile system.
- Remove asphalt and repave roadways and parking lots.
- Parking lots should be restriped with adequate ADA spaces.
- Repair or replace fixed furnishings in science rooms.
- Update lighting to LED fixtures: install lighting control system with LED lighting.
- Refinish exterior doors and interior doors.
- Inspect and repair exterior door weather stripping.
- Replace single pane windows with energy efficient double pane.
- Inspect all window caulking and repair as necessary.
- Strip and replace floor tile as floor tile system is at the end of useful life expectancy.
- Strip and re-apply liquid applied flooring in kitchen.
- Thoroughly clean carpeted areas.
- Replace cafeteria tables.
- Update science lab tables.
- Consider an auditorium to house visual and performing arts.
- Consider a kitchen expansion.
- Consider a library expansion.
Transportation - Bus Building and Office
- Cleanup
- Repaint exterior of bus building.
- Repaint interior wall finishes.
- Repaint interior ceiling finishes.
- Pave gravel parking lot; add appropriate parking and ADA spaces.
- Update lighting to LED fixtures.
- Replace windows with energy efficient double pane.
Facility Dashboard, and its Facility Condition Assessment (“FCA”) assumes “like for like” system(s). It does not take into consideration design changes or code upgrades. The Facility Condition Index (FCI) is a standard facility metric that evaluates a facilities identified deficiencies against the replacement cost of the entire facility to arrive at a replacement cost ratio. Our cost estimates are in current day dollars and should be used for planning purposes only. We encourage and recommend review and updating of your construction scope and estimates prior to seeking funding.