Priority Projects
Deweyville Administration
- No priority projects at this time.
Deweyville Elementary School
- No priority projects were identified.
Deweyville High School and Middle School
- Replace damaged metal siding along CTE building.
- Replace building seam calking and damaged masonry.
- Replace damaged plumbing fixtures and accessories.
- Replace single-ply roofing system.
- Replace all gutters and downspouts.
- Clean, replace missing fasteners and calking on metal roof.
- Replace caulking around window units on main building.
- Replace all windows and frames on ticket booths.
- See Safety & Security recommendations on the Facility Details page.
Deweyville Maintenance and Transportation
- No projects identified at this time.
Additional Projects, if Funds Become Available
Deweyville Administration
- Civil Engineer study.
- Civil Engineer study.
- See Safety & Security recommendations on the Facility Details page.
Deweyville Elementary School
- Remove dated playground equipment.
- Kitchen addition.
- Playground canopies.
- Removed dated playground equipment and flatwork.
- Implement manufacturer recommended roof maintenance.
- Kitchen addition.
- Playground shade canopies.
Deweyville High School and Middle School
- Replace gutters and downspouts.
- Power washing.
- Bleachers.
- Re-key campus.
- Kitchen addition.
- Library addition.
- Repaint exteriors of athletic facilities.
- Repaint interior masonry surfaces.
- Repair and repaint damaged wallboard surfaces in main building and press box.
- Replace stained and sagging ceiling tiles.
- Replace grid system and tiles in the football press box.
- Paint interior tectum panels.
- Paint interior decking in gym.
- Top-coat and re-stripe parking lots.
- Replace all damaged restroom and locker room accessories.
- Repair damaged casework in classrooms, band hall and offices.
- Replace damaged and deteriorated furnishings in classrooms and cafeteria.
- Replace all lighting with LED fixtures in the main building and the football press box.
- Repaint all exterior metal doors and replace damaged hardware.
- Replace metal doors on ticket booths, storage facilities, and press boxes for all athletic fields.
- Replace damaged hardware and accessories on overhead doors.
- Replace damaged wood doors in band hall.
- Repaint interior metal doors and frames.
- Replace damaged and stained carpet flooring.
- Replace damaged floor tiles.
- Repair minor cracking in concrete flooring.
- Replace damaged sections of wood flooring in gym.
- Power-wash exterior of buildings.
- Kitchen addition.
- Library addition.
- Replace damaged baseball and softball bleachers.
Deweyville Maintenance and Transportation
- Implement manufacturer-recommended maintenance for roof system.
Facility Dashboard, and its Facility Condition Assessment (“FCA”) assumes “like for like” system(s). It does not take into consideration design changes or code upgrades. The Facility Condition Index (FCI) is a standard facility metric that evaluates a facilities identified deficiencies against the replacement cost of the entire facility to arrive at a replacement cost ratio. Our cost estimates are in current day dollars and should be used for planning purposes only. We encourage and recommend review and updating of your construction scope and estimates prior to seeking funding.