Priority Projects
Breckenridge Main Campus - ALC and DAEP
- See Safety & Security recommendations on the Facility Details page.
- Repair or replace damaged or missing window seals and re-caulk frame as needed.
- Repair or replace doors and hardware as needed for ADA accessibility and refresh finish surfaces.
- Replace weatherstripping and door sweeps on exterior doors as needed.
- Trim all vegetation overhanging roof.
- Install gutter, downspouts, and splash blocks.
- Update to ADA compliant plumbing fixtures in kitchen area.
Breckenridge Main Campus - Ag Classrooms and Shop with Storage
- See Safety & Security recommendations on the Facility Details page.
- Remove all obstruction restricting access to electrical panels add blanks in open breaker spaces; Label floor if needed.
- Review intercom system, update cabling and devices as needed.
- Install proper ventilation for each welding station.
- Trim all vegetation overhanging roof.
- Install splash blocks at downspouts.
- Creating positive storm water drainage away from foundation.
- Repair and re-seal minor slab cracking in classroom, observe for movement, if worsens recommend engineering study to determine cause and proper mitigation.
- Check fasteners and flashings for tightness and seal on walls panels, repair or replace damaged wall panels as needed.
- Repair or replace damaged or missing window seals and re-caulk frame as needed.
- Remove any material or vegetation against the wall.
- Refresh exterior finish surfaces.
- Repair damaged plumbing fixtures as needed.
- Replace HVAC units at or past their useful life expectancy.
- Update duct work, web-based energy management system, test, and balance new HVAC units when installed.
Breckenridge Main Campus - Athletic & Fine Arts Center
- See Safety & Security recommendations on the Facility Details page.
- Back fill areas around the foundation that have settled over time, assure proper storm water drainage away from structure, adjust landscape irrigation as needed.
- Replace HVAC units and domestic water heaters at or past their useful life expectancy.
- Update duct work, web-based energy management system, test, and balance new HVAC units when installed.
- Redistribute or re-install ballast material to cover exposed roof surface.
- Install splash blocks or other preventive in areas where ballast is being washed away.
- Check fasteners and flashings on canopy roof system for tightness and seal, repair or replace as needed.
- Re-caulk window frames as needed.
- Replace cracked or broken mirrors.
Breckenridge Main Campus - Bailey Auditorium
- See Safety & Security recommendations on the Facility Details page.
- There are indications of foundation movement, recommend engineering study to determine cause and proper mitigation before expending substantial funds.
- Promote stable soil conditions around foundation by creating positive storm water drainage away from structure, eliminating standing water next to, or infiltrating under foundation.
- Repair missing and cracking stucco on columns; Refresh finish and seal surface.
- Repair or replace damaged brick facia, re-grout areas as needed, clean masonry surface, apply algaecide, and re-seal surfaces.
- Seal slab cracking and observe for movement; If movement persists, consider engineering study.
- Repair or replace wall structure as needed to support loading and finish surfacing.
- Provide an ADA accessible route connecting compliant parking, building entrances, public areas within the building, the stage, and compliant restrooms.
- Replace non-ADA compliant plumbing fixtures as needed.
- Repair, replace or re-locate plumbing supply lines and wastewater lines for ADA compliant fixtures.
- Update restroom accessories and stalls for ADA compliance as needed.
- Remove all obstruction restricting access to electrical panels; Label floor if needed.
- Replace weatherstripping and door sweeps on exterior doors as needed.
- Replace interior and exterior door hardware as needed for ADA compliance and refresh finish surfaces.
Breckenridge Main Campus - Buckaroo Stadium
- See Safety & Security recommendations on the Facility Details page.
- Replace door hardware for ADA accessibility and refresh finish surfaces.
- Add wheelchair seating and improve travel path from visitor's bleachers for ADA compliance.
- Replace HVAC units at or past their useful life expectancy.
- Recommend bleacher support structure be inspected by design professional or replace bleachers with commercially designed system.
- Install railings on stair and landings with no larger than 4-inch opening.
- Update door hardware using a district master restricted keyway system, and refresh finish surfaces.
Breckenridge Main Campus - Cafeteria, Home Economics, and Life Skills
- See Safety & Security recommendations on the Facility Details page.
- Kitchen addition.
- Repair broken windows.
- Replace door hardware for ADA accessibility and refresh finish surfaces.
- Re-seal the building envelope by regrouting or repointing the masonry work and replacing cracking or missing expansion joint caulking as needed.
- Trim all vegetation overhanging roof.
- Update aging and maintenance prone kitchen equipment.
Breckenridge Main Campus - High School
- See Safety & Security recommendations on the Facility Details page.
- Replace weatherstripping and door sweeps on exterior doors as needed.
- Remove all obstruction restricting access to electrical panels; Label floor if needed.
- Close open junction boxes, reconnect electrical conduits, and install outdoor rated disconnects on HVAC units or protect then form rain.
- Investigate and take action to reduce high CO2 levels.
- Re-seal the building envelope by regrouting or repointing the masonry work, filling holes, and replacing cracking or missing caulking around penetrations.
- Promote stable soil conditions around foundation by creating positive storm water drainage away from structure.
- Replace damaged or non-ADA compliant plumbing fixtures as needed.
- Update plumbing fixtures and accessories for ADA compliance.
- Update door hardware for ADA compliance.
- Install ADA parking spaces at 1 per 25 standard spaces.
Breckenridge Main Campus - Junior High School and Portable
- See Safety & Security recommendations on the Facility Details page.
- Update door hardware to ADA compliant hardware.
- Seal open junction boxes, reconnect electrical conduits, and install outdoor rated disconnects on HVAC units or protect then form rain.
- Install additional receptacles in classrooms.
- Remove all obstruction restricting access to electrical panels; Label floor if needed.
- Promote stable soil conditions around foundation by creating positive storm water drainage away from structure.
- Create drainage channel along north wall from east door to west door to stop storm water infiltration.
- Re-seal the building envelope by regrouting or repointing the masonry work and replacing cracking or missing expansion joint caulking as needed.
- Remodel of administrative space and library.
- Install ADA compliant ramp to original building front if or when entrance is relocated.
- Repair damaged fixtures and replace non-ADA compliant plumbing fixtures.
- Investigate and take action to reduce high CO2 levels.
- Repair and re-seal cracks in stair wells, observe for movement; If movement persists, consider engineering study to determine cause and proper mitigation.
Breckenridge Main Campus - LT Cook Gym and Junior High Field House
- See Safety & Security recommendations on the Facility Details page.
- Replace weatherstripping and door sweeps on exterior doors as needed.
- Replace interior and exterior doors as needed, replace hardware for ADA compliance, and refresh finish surfaces.
- Update restroom accessories, stalls and showers for ADA compliance as needed.
- Repair, replace, or update damaged and non-ADA compliant plumbing fixtures as needed.
- Repair, replace or re-locate plumbing supply lines and wastewater lines for ADA compliant fixtures.
- Re-seal the building envelope by regrouting or repointing the masonry work, filling holes, replace cracking or missing door, window, and expansion joint caulking.
- Promote stable soil conditions around foundation by creating positive storm water drainage away from structure and eliminating standing water next to foundation.
Breckenridge Main Campus - Practice Gym
- See Safety & Security recommendations on the Facility Details page.
- Re-seal the building envelope by regrouting or repointing the masonry work, filling holes, and replacing cracking or missing caulking around penetrations.
- Repair or replace damaged or missing window seals and re-caulk frame as needed.
- Replace or re-install damaged and non-ADA compliant plumbing fixtures as needed.
- Repair, replace or re-locate plumbing supply lines and wastewater lines for ADA compliant fixtures.
- Replace HVAC units at or past their useful life expectancy.
- Update duct work, web-based energy management system, test, and balance new HVAC units when installed.
- Updating of door hardware, restroom facilities, and signage is needed for ADA compliance.
- Install additional electrical receptacles in classrooms.
- Remove all obstruction restricting access to electrical panels; Label floor if needed.
Breckenridge Main Campus - Vocational and Band
- See Safety & Security recommendations on the Facility Details page.
- Deep clean, repair or replace aged and damaged soft surface flooring in band hall.
- Update door hardware and refresh finish surfaces.
- Remove all obstruction restricting access to electrical panels; Label floor if needed.
- Install covers on open electrical equipment and install weather rated disconnect switches on HVAC equipment.
- Facility is not fully ADA compliant there should be an ADA accessible route connecting compliant parking, compliant building entrances to all campus buildings, public areas within the buildings, and compliant restrooms.
- Trim all vegetation overhanging roof.
- Replace non-ADA compliant plumbing fixtures, re-locate supply and wastewater lines as needed for ADA compliant fixtures.
- Repair and re-seal slab as needed where cracking and observe for movement.
- Repair wall structure as needed to support loading and finish surfacing, observe for movement.
- Re-seal the building envelope by regrouting or repointing the masonry work, filling holes, and replacing cracking or missing caulking around penetrations.
Breckenridge Main Campus - Vocational Classrooms
- See Safety & Security recommendations on the Facility Details page.
- Replace damaged and non-ADA compliant plumbing fixtures as needed.
- Repair, replace or re-locate plumbing supply lines and plumbing wastewater lines for ADA compliant fixtures.
- Updating of restroom facilities and signage is needed for ADA compliance.
- Replace door hardware for ADA compliance and refresh finish surfaces.
District Services Center - Maintenance, Transportation, Distribution
- See Safety & Security recommendations on the Facility Details page.
- Remove all obstruction restricting access to electrical panels; Label floor if needed.
- Install ADA compliant accessible path of travel connecting parking, building entrances, public areas, areas within facility intended for use, restrooms, and drinking fountains within the buildings.
- Install ADA compliant parking, building entrance, public areas, restrooms, drinking fountains, and areas within facility intended for use.
- Repair fuel containment retaining wall.
- Check fasteners and flashings on roof system for tightness and seal, repair or replace as needed.
- Update to ADA compliant plumbing fixtures.
- Repair, replace or re-locate plumbing supply lines and wastewater lines for ADA compliant fixtures.
- Replace HVAC units at or past their useful life expectancy.
- Update duct work, web-based energy management system, test, and balance new HVAC units when installed.
- Repair cracks in walls and observe, if cracking persists or increases an engineering study on the structure is recommended.
- Remove any material or vegetation against the wall panels.
- Replace damage damaged panel or remove oxidation, apply inhibitor, reseal, or refresh surface.
East Elementary School - Gym
- See Safety & Security recommendations on the Facility Details page.
- Re-seal the building envelope by checking fasteners and flashings for tightness and seal on the wall panels also repair or replace damaged wall panels as needed.
- Properly install wastewater lines serving water fountains.
- Replace HVAC units and heating units at or past their useful life expectancy.
- Updating of door hardware, refresh finished surface, and update signage is needed for ADA compliance.
- If enclosed corridor is not constructed install ADA compliant walkway between Gym and Main building.
- Replace weatherstripping and door sweeps on exterior doors.
East Elementary School - Main
- See Safety & Security recommendations on the Facility Details page.
- Re-seal the building envelope by regrouting or repointing the masonry work, filling holes, and replacing cracking or missing caulking around penetrations.
- Promote stable soil conditions around foundation by creating positive storm water drainage away from structure and eliminating standing water next to foundation.
- Seal cracks and protect exposed structural steel.
- Repair, replace or re-locate plumbing supply lines and wastewater lines for ADA compliant fixtures.
- Replace HVAC units at or past their useful life expectancy.
- Reduce high CO2 levels observed.
- Update duct work, web-based energy management system, test, and balance new HVAC units when installed.
- Replace missing and damaged soffit, refresh finish surface.
- Repair or replace roofing system to resolve any existing canopy leaks.
- Check fasteners and flashings on roof system for tightness and seal, repair or replace as needed (portables).
- Add 22 regular parking spaces and ADA compliant parking space to meet 1 per 25 standard spaces.
- Repair or replace kitchen equipment.
- Update restroom accessories and stalls for ADA compliance as needed.
- Repair hand rail supports on ramps.
- Repair or repour uneven surfaces to reduce potential tripping hazards.
- Rebuilding electrical service to provide one point of entry replacing the existing two points of entry.
- Install additional receptacles in classrooms.
- Remove all obstruction restricting access to electrical panels; Label floor if needed.
- Replace weatherstripping and door sweeps on exterior doors as needed.
- Replace interior and exterior door hardware for ADA compliance also updating hardware to a district master restricted keyway system, and refresh finish surfaces.
- Add directional signage, ADA compliant parking signage and ADA compliant room signage.
- Classroom addition, 6 rooms with restrooms and kitchen addition to support capacity.
- Update and remodel administrative area and kitchen.
North Elementary - East Wing
- See Safety & Security recommendations on the Facility Details page.
- Replace weatherstripping and door sweeps on exterior doors as needed.
- Update interior and exterior door hardware for ADA compliance and refresh finish surfaces.
- Repair or replace structural support members and decking as needed to return roof decking to original elevation and stiffness.
- Remove or properly install electrical runs on roof system before work to install new roofing.
- Indications of movement observed in foundation, engineering study recommended to determine cause and mitigation.
- Repair or replace damaged masonry wall units, cracking in brick face, re-grout, and re-seal surface as needed; Observe repaired masonry.
- Provide ADA compliant route connecting parking, building entrances, public areas, and restrooms.
- Repair, replace, or update non-ADA compliant plumbing fixtures as needed.
- Repair, replace, or re-locate plumbing supply lines and wastewater lines for ADA compliant fixtures.
North Elementary - Gym
- See Safety & Security recommendations on the Facility Details page.
- Update door hardware and refresh finish surfaces.
- Replace weatherstripping and door sweeps on exterior doors as needed.
- Remove all obstruction restricting access to electrical panels; Label floor if needed.
- Recommend ADA compliant landing at all exterior doors.
- Check fasteners and flashings on roof system for tightness and seal, repair or replace as needed.
- Creating positive storm water drainage away from structure and eliminate standing water next to foundation.
- Re-seal the building envelope by checking fasteners and flashings for tightness and seal on the walls, repair or replace as needed.
- Remove any material at the wall base, remove oxidation, apply inhibitor, reseal, refresh finish surface or replace panel section if rusted through.
North Elementary - Middle Wing
- See Safety & Security recommendations on the Facility Details page.
- Repair or replace damaged or missing windows and seals; Re-caulk frame as needed.
- Replace weatherstripping, door sweeps, and hardware on exterior doors as needed.
- Replace interior doors and hardware as needed for ADA compliance and refresh finish surfaces.
- Remove all obstruction restricting access to electrical panels; Label floor if needed.
- Update restroom accessories and stalls for ADA compliance as needed when building is occupied.
- Repair or replace aged or damaged cabinets and countertops as needed when facility is occupied.
- Provide appropriate furnishings if facility is occupied by students.
- Provide ADA accessible route connecting compliant parking, compliant building entrances, public areas within the building, and compliant restrooms.
- Update fixtures if facility is occupied.
- Repair, replace or re-locate plumbing supply lines and wastewater lines for ADA compliant fixtures.
- Engineering study recommended on foundation to determine cause and if mitigation is a fiscally sound option.
- Repair and re-seal cracks in floor and construction joints.
- Repair or replace wall and roofing structural members as needed, if needed.
- Re-seal the building envelope by regrouting or repointing the masonry work and replacing cracking or missing expansion joint caulking as needed.
North Elementary - West Wing
- See Safety & Security recommendations on the Facility Details page.
- Remove all obstruction restricting access to electrical panels; Label floor if needed.
- Promote stable soil conditions around foundation by creating positive storm water drainage away from structure and eliminating standing water next to foundation.
- Replace weatherstripping and door sweeps on exterior doors as needed.
- Replace cracking and missing window caulking.
- Replace window seals as needed.
- Provide an ADA accessible route connecting compliant parking, compliant building entrances to all campus buildings, public areas within the buildings, and compliant restrooms.
- Repair or replace structural support members and decking as needed to return roof decking to original elevation and stiffness.
- Replace roofing system due to age and deteriorating condition.
- Update non-ADA compliant plumbing fixtures as needed.
- Repair, replace or re-locate plumbing supply lines and wastewater lines for ADA compliant fixtures.
- Cracking observed in masonry work, observe for change, if movement persists engineering study is recommended to determine cause and mitigation.
- Fill open holes in wall surface, replace any cracking or missing caulking around penetrations and construction joints.
South Elementary School - Main, Modular, Portables
- See Safety & Security recommendations on the Facility Details page.
- Re-seal the building envelope by regrouting or repointing the masonry work, sealing cracks, replacing cracked masonry units when needed, and resealing expansion joint caulking.
- Repair and re-seal cracks in floor and construction joints after mitigation is completed for foundation, observe for movement.
- Repair cracking and gaps in wall structure; observe for movement.
- Movement indicated by cracks in brick facia of the library wing, engineering study of cause, structure condition, and proper mitigation is recommended before substantial expenditure of funds.
- Repair cracked or missing slab exposing structural steel.
- Replace missing and damaged soffit, refresh finish surface.
- Update of door hardware, restroom facilities, accessible paths, playscapes, and signage for ADA compliance.
- Repair or replace ageing kitchen equipment.
- Install additional receptacles in classrooms.
- Install LED lighting.
- Update cabling, servers, APs, switches and routers; complete Fiber Install Project.
- Install lighting control system.
- Update service and switch gear as needed to support load.
- Replace weatherstripping and door sweeps on exterior doors.
- Replace aged and damaged resilient flooring.
- Promote stable soil conditions around foundation by creating positive storm water drainage away from structure foundation.
South Elementary School - Track & Field Stadium w/ Tennis Courts
- See Safety & Security recommendations on the Facility Details page.
- Re-seal the building envelope by regrouting, repointing, re-sealing cracks in the masonry work, and refresh finished surface as needed.
- Observe cracks in field storage for movement, if movement persists an engineering study on the structure is recommended before substantial expenditure of funds.
- Check fasteners and flashings for tightness and seal on paneled walls, seal all openings, repair or replace damaged wall panels as needed.
- Repair or replace wood or masonry wall structures to support loading as needed.
- Promote stable soil conditions around foundation by creating positive storm water drainage away from structure and eliminating standing water next to foundation.
- Install restroom wastewater drain lines in compliance with one of the state recognized Plumbing Codes.
- Install adequately sized water supply line to provide adequate water pressure all campus facilities.
- Replace HVAC units at or past their useful life expectancy.
- Field storage building has failing roofing system and needs major repair or replacement.
- Repair roofing system to resolve any existing leaks on any of the structures.
- Repair or replace damaged soffit and facia, refresh finish surface.
- Repair existing and install additional gutter, downspouts, and splash blocks where needed.
- Update door hardware, bleacher seating, walk paths, ramps, and signage is needed for ADA compliance.
- Replace damaged doors and door hardware.
South Elementary School - Gym
- See Safety & Security recommendations on the Facility Details page.
- Re-seal the building envelope by checking fasteners and flashings for tightness and seal on the wall panels also repair or replace damaged wall panels as needed.
- Replace HVAC units and heating units at or past their useful life expectancy.
- Updating of door hardware, refresh finished surface, and update signage is needed for ADA compliance.
- If enclosed corridor is not constructed install ADA compliant walkway between Gym and Main building.
- Replace weatherstripping and door sweeps on exterior doors.
Administration - Administration
- Re-seal minor slab cracking and masonry wall cracking, indicating movement, observe repairs for additional movement. Observe cracking and if worsens recommend engineering study to determine cause and proper mitigation.
- Re-seal the building envelope by checking fasteners and flashings for tightness and seal. Clean steel wall panel surface, remove any oxidation, apply rust inhibitor, recalk penetrations, and refresh finished surface or replace wall panel to reseal building envelope.
- Re-seal the building envelope by regrouting or repointing the masonry work, filling holes, and replacing cracking or missing caulking around penetrations. Re-seal cracking of brick facia, indicating movement, observe repairs for additional movement. If cracking worsens recommend engineering study to determine cause and proper mitigation.
- Replace interior door hardware updating to district master restricted keyway system, and refresh finish surfaces.
- Update to ADA compliant plumbing fixtures.
- Repair, replace or re-locate plumbing supply lines for ADA compliant fixtures.
- Repair, replace or re-locate plumbing wastewater lines for ADA compliant fixtures.
- Update restroom accessories and stalls for ADA compliance as needed.
- Repair damaged roadways and parking, slurry coat asphalt surfaces and re-striping all parking. Install ADA parking spaces at 1 per 25 standard spaces.
- Repair damaged roadways and parking, slurry coat asphalt surfaces and re-striping all parking. Install ADA parking spaces at 1 per 25 standard spaces.
- Install ADA compliant landings at back doors and compliant ramps for front parking spaces.
- Mechanical systems 30 years or older should be inspected and repaired or replaced as inspection dictates. Funding for inspection.
- Network interconnectivity is failing, update or replace system.
- See Safety & Security recommendations on the Facility Details page.
- Replace weatherstripping and door sweeps on exterior doors as needed.
- Refresh exterior and interior door finished surfaces as needed.
- Update door hardware and refresh finish surfaces.
- Promote stable soil conditions around foundation by creating positive storm water drainage away from structure and eliminating standing water next to foundation.
- Repair damaged parking lots, restripe, add appropriate ADA Van spaces and ADA signage; Install ADA parking spaces at 1 per 25 standard spaces.
- Provide an ADA compliant accessible path of travel connecting parking, building entrances, public areas, restrooms, and drinking fountains within the buildings.
- Update restroom accessories and stalls for ADA compliance as needed.
- Trim all vegetation overhanging roof.
- Re-seal minor slab cracking, indicating movement, observe repairs for additional movement.
- Re-seal the building envelope by checking fasteners and flashings for tightness and seal, clean steel wall panel surface, remove any oxidation, apply rust inhibitor, recalk penetrations, and refresh finished surface or replace wall panel to reseal building envelope.
- Re-seal the building envelope by repairing cracked masonry work, regrouting or repointing, filling holes, and replacing cracking or missing caulking around penetrations; Observe repairs for movement, if cracking worsens recommend engineering study to determine cause and proper mitigation.
- Replace HVAC units at or past their useful life expectancy.
- Update duct work, web-based energy management system, test, and balance new HVAC units when installed.
- Update to ADA compliant plumbing fixtures.
- Repair, replace or re-locate plumbing supply lines and wastewater lines for ADA compliant fixtures.
Ag Farm - Ag Barns
- Replace door hardware for ADA accessibility using a district master restricted keyway system, and refresh finish surfaces.
- Install card reader access control system.
- Install intrusion alarm system.
- Install fire alarm system.
- Install connectivity to network.
- See Safety & Security recommendations on the Facility Details page.
- Replace door hardware as needed.
- Remove all obstruction restricting access to electrical panels.
- Provide ADA compliant route connecting compliant parking to compliant building entrances and to the public areas within the buildings.
- Repair roofing system to resolve any existing leaks.
- Check fasteners and flashings on roof system for tightness and seal, repair or replace as needed.
- Repair or replace skylights.
- Check fasteners and flashings for tightness and seal on walls, repair or replace as needed.
- Remove any material at the wall base, remove oxidation, apply inhibitor, reseal, or refresh surface.
- Repair or replace damaged wall panels as needed.
Additional Projects, if Funds Become Available
Breckenridge Main Campus - ALC and DAEP
- Deep clean, repair or replace aged and damaged flooring.
- Install additional receptacles in classroom.
- Install LED lighting.
- Install lighting control system.
- Update restroom accessories and stalls for ADA compliance as needed.
- Repair or replace aged or damaged cabinets and countertops as needed.
- Replace damaged moveable furnishings as needed.
- Refresh high touched interior wall finished surfaces.
- Refresh painted ceiling finished surfaces.
- See Safety & Security recommendations on the Facility Details page.
Breckenridge Main Campus - Ag Classrooms and Shop with Storage
- Consider relocation classrooms onto main campus or install secure vestibule entrance.
- Consider relocation classrooms onto main campus or building an enclosed connector if ROW could be closed.
- Deep clean, repair or replace aged and damaged resilient flooring.
- Repair cracking of finished concrete surfaces and re-seal where needed.
- Install LED lighting and lighting control system.
- Update restroom accessories and stalls for ADA compliance as needed.
- Repair or replace aged or damaged cabinets and countertops as needed.
- Replace damaged moveable furnishings as needed.
- Refresh finished wall surface.
- Replace damaged and stained ceiling tiles as needed.
- Clean and refresh finished ceiling surfaces.
- See Safety & Security recommendations on the Facility Details page.
Breckenridge Main Campus - Athletic & Fine Arts Center
- Install secure vestibule
- Install LED lighting.
- Re-install missing or broken electrical system covers.
- Remove all obstruction restricting access to electrical panels; Label floor if needed.
- Install lighting control system.
- Fill open holes in exterior wall surface, replace any cracking or missing caulking around penetrations.
- Refresh high touched interior wall finished surfaces, where needed.
- Clean and refresh finished open frame ceiling surfaces.
- Deep clean, repair or replace aged and damaged soft surface and resilient flooring.
- Deep clean, reseal surface cracking, and refresh finished floor surface on polished concrete and liquid applied flooring.
- Update restroom accessories and repair stalls as needed for ADA compliance.
- Repair or replace aged or damaged lockers, cabinets, and countertops as needed.
- Replace damaged moveable furnishings as needed.
- See Safety & Security recommendations on the Facility Details page.
Breckenridge Main Campus - Bailey Auditorium
- Complete update and remodel of interior providing no foundation issues.
- Connecting corridor between High School and Auditorium.
- Install LED lighting.
- Install lighting control system.
- Review intercom system, update cabling and devices as needed.
- Update auditorium seating, lighting, curtains, control, and sound systems.
- Repair or replace aged or damaged cabinets and countertops as needed.
- Refresh high touched interior wall finished surfaces.
- Repair or replace damaged ceilings and refresh finished surfaces as needed.
- Replace damaged and stained ceiling tiles as needed.
- Repair or replace damaged or missing window seals as needed.
- Deep clean, repair or replace aged and damaged soft surface flooring.
- Deep clean, repair or replace aged and damaged resilient flooring.
- Deep clean, repair or replace ceramic tile flooring, re-grout and re-seal surface where needed.
- See Safety & Security recommendations on the Facility Details page.
Breckenridge Main Campus - Buckaroo Stadium
- Bleacher and press box replacement
- Relocate Stadium, New Facility with track.
- Install additional wheelchair and companion seating.
- Artificial turf replacement when needed
- Repair oxidation damage on door frames.
- Update concession kitchen equipment as needed.
- Update restroom accessories as needed.
- Repair or replace damaged cabinets and countertops as needed.
- Check fasteners and flashings for tightness and seal on walls; re-caulk door and window frames as needed.
- Repair or replace wooden decking as needed in press box to return flooring to original elevation and stiffness.
- Refresh finished surfaces as needed.
- See Safety & Security recommendations on the Facility Details page.
Breckenridge Main Campus - Cafeteria, Home Economics, and Life Skills
- Kitchen addition.
- Vestibule.
- Remodel of Home Economics and Life Skills.
- Remodel of educational use area of building.
- Deep clean, repair or replace aged and damaged soft surface flooring.
- Deep clean, repair or replace aged and damaged resilient flooring.
- Repair cracking of finished concrete surfaces and re-seal where needed.
- Replace old leaking window system with energy efficient window systems.
- Install LED lighting.
- Remove all obstruction restricting access to electrical panels; Label floor if needed.
- Install lighting control system.
- Repair or replace aged or damaged cabinets and countertops as needed.
- Replace damaged moveable furnishings as needed.
- Repair or replace damaged walls, refresh finished surfaces where needed.
- Repair damaged ceilings, refresh finished surfaces, replace damaged and aged ceiling tiles with 2X2 grid and tiles.
- See Safety & Security recommendations on the Facility Details page.
Breckenridge Main Campus - High School
- Addition of an enclosed connector between HS, cafeteria, band and vocational classrooms; at least restrict public view and cover walkway.
- Relocate Ag Classrooms onto main campus.
- Relocate DAEP onto main campus.
- Addition of an enclosed connector between HS and Athletics/Fine Arts; at least restrict public view and cover walkway.
- Secure entry vestibule inside a monitored, controlled entrance.
- Deep clean, repair or replace aged and damaged flooring.
- Replace old window system with energy efficient window systems.
- Install additional receptacles in classrooms.
- Install LED lighting.
- Install lighting control system.
- Repair uneven walk surfaces to reduce potential tripping hazards.
- Update science labs equipment and furnishings.
- Update restroom accessories and stalls.
- Repair or replace aged or damaged lockers, cabinets, and countertops as needed.
- Replace damaged moveable furnishings as needed.
- Consider installing hard surface drive between Ag Shop and Cosmetology.
- Consider installing hard surface paving replacing existing gravel and grass surfaces.
- Slurry coat existing asphalt surfaces where needed.
- Re-striping all slurry coated and new hard surface parking.
- Seal cracking in flooring and observe for movement; If movement persists, consider engineering study to determine cause and proper mitigation.
- Repair or replace wall structure as needed to support loading and finish surfacing.
- Refresh interior wall finished surfaces.
- Repair damaged ceilings and refresh finished surfaces as needed.
- Replace damaged and aged ceiling tiles with 2X2 grid and tiles.
- Repair damaged roll up interior door.
- See Safety & Security recommendations on the Facility Details page.
Breckenridge Main Campus - Junior High School and Portable
- Create drainage way from east door to west door along the north wall of the structure (225') lowering drainage below finish floor of JHS with retaining wall and hand railing.
- Install second set of store front doors at original main entrance to create secure vestibule.
- Install ADA compliant ramp to original building front.
- Remodel of administrative space and library.
- Classroom addition replacing portable with enclosed corridor to cafeteria and practice gym.
- Access controlled drive gate.
- Classroom addition replacing portable.
- Repair or replace aged and damaged flooring.
- Update single pane window systems with energy efficient windows systems.
- Install LED lighting.
- Replace weatherstripping and door sweeps on exterior doors as needed.
- Install lighting control system.
- Update restroom accessories and stalls for ADA compliance as needed.
- Repair or replace aged or damaged lockers, cabinets, and countertops as needed.
- Replace damaged moveable furnishings as needed.
- Repair missing or damaged soffit and facia, refresh finish surface.
- Repair or replace damaged tread and nosing on stair steps as needed.
- Refresh high touched interior wall finished surfaces.
- Replace damaged and aged ceiling tiles with 2X2 grid and tiles.
- See Safety & Security recommendations on the Facility Details page.
Breckenridge Main Campus - LT Cook Gym and Junior High Field House
- Deep clean, reseal surface cracking, and refresh finished floor surface of polished concrete and liquid applied flooring.
- Deep clean, repair or replace soft surface, resilient, and ceramic tile flooring where needed, re-grout and re-seal surface.
- Replace old window system with energy efficient window systems.
- Install additional electrical receptacles as needed.
- Install LED lighting.
- Remove all obstruction restricting access to electrical panels; Label floor if needed.
- Install lighting control system.
- Repair or replace aged or damaged lockers, cabinets, and countertops as needed.
- Replace damaged moveable furnishings as needed.
- Repair and re-seal cracks in concrete floor, repair or replace finish surfacing, observe for movement.
- Repair cracking in masonry wall; observe for movement.
- Refresh high touched interior wall finished surfaces.
- Clean, repair or replace aged and damaged ceilings and refresh or replace finished surfaces as needed.
- See Safety & Security recommendations on the Facility Details page.
Breckenridge Main Campus - Practice Gym
- Install secure vestibule.
- Deep clean, repair or replace aged and damaged flooring.
- Re-finish wood flooring surface where needed from roof leak.
- Install lighting control system.
- Install LED lighting.
- Repair or replace aged or damaged lockers, cabinets, and countertops as needed.
- Replace damaged moveable furnishings as needed.
- Refresh or clean masonry finish surface, apply algaecide and re-seal surface in showers.
- Refresh high touched interior wall finished surfaces, masonry and paneling.
- Clean, repair or replace aged and damaged ceilings and refresh finished surfaces as needed.
- See Safety & Security recommendations on the Facility Details page.
Breckenridge Main Campus - Vocational and Band
- Secure entry vestibule inside a monitored, controlled entrance if enclosed corridor and or securing perimeter is not accomplished.
- Full remodel of Vocational and Band facility.
- Consider a full remodel of the building to update ADA access, provide appropriate, and adequate space for all users.
- Deep clean, repair or replace aged and damaged flooring surfaces.
- Update steel frame single pane window systems with energy efficient windows systems.
- Install lighting control system.
- Install LED lighting.
- Repair or replace aged or damaged cabinets and countertops as needed.
- Replace damaged moveable furnishings as needed.
- Refresh high touched interior wall finished surfaces.
- Repair damaged ceilings, refresh finished surfaces, and replace damaged and aged ceiling tiles with 2X2 grid and tiles.
- See Safety & Security recommendations on the Facility Details page.
Breckenridge Main Campus - Vocational Classrooms
- Secure entry vestibule inside a monitored, controlled entrance if enclosed corridor and or securing perimeter is not accomplished.
- Deep clean, repair or replace aged and damaged soft surface, vinyl tile, and ceramic tile flooring.
- Re-caulk window frames as needed.
- Install LED lighting.
- Review intercom system, update cabling and devices as needed.
- Install lighting control system.
- Repair or replace aged or damaged cabinets, and countertops as needed.
- Replace damaged moveable furnishings as needed.
- Budget for replacement of HVAC units approaching their useful life expectancy by 2026 and update duct work as needed when HVAC units are replaced.
- Repair masonry block wall structure as needed and refresh finish surfacing as needed.
- Repair damaged ceilings and ceiling tiles, refresh or replace finished surfaces as needed.
- Re-seal the building envelope by replacing cracking or missing door, window, and expansion joint caulking as needed.
- See Safety & Security recommendations on the Facility Details page.
District Services Center - Maintenance, Transportation, Distribution
- Repair fuel containment retaining wall.
- Install shelter for busses and white fleet.
- Deep clean, repair or replace aged and damaged resilient flooring.
- Deep clean, reseal surface cracking, and refresh finished floor surface on liquid applied flooring.
- Replace old window system with energy efficient window systems.
- Install LED lighting.
- Update to fiber cabling and devices to support secure Wi-Fi as needed.
- Install lighting control system.
- Repair and re-seal concrete surface, observe form movement.
- Repair cracks in masonry walls and observe, if cracking persists or increases an engineering study on the structure is recommended.
- Repair masonry wall surface and refresh finished surfaces.
- Refresh blemished surface of wood paneling.
- Refresh painted wallboard ceiling finished surfaces.
- Replace damaged and aged ceiling tiles with 2X2 grid and tiles.
- Clean and refresh open structure ceiling finished surfaces.
- Repair or replace aged or damaged cabinets and countertops as needed.
- See Safety & Security recommendations on the Facility Details page.
East Elementary School - Gym
- Install conditioned air in Gym.
- Install conditioned air in Gym.
- Deep clean, reseal surface cracks, and refresh finished floor surface.
- Install LED lighting.
- Install data system.
- Review intercom system, update cabling and devices as needed.
- Install lighting control system.
- Install splash blocks at downspouts.
- Install protective surface over exposed vinyl backed insulation.
- Consider installing some type of sound dampening.
- Refresh interior wall finished surfaces.
- See Safety & Security recommendations on the Facility Details page.
East Elementary School - Main
- Update playscape equipment.
- Install canopies at student loading and unloading areas.
- Construct a secure vestibule at main entrance. *
- Add directional signage, ADA compliant parking signage and ADA compliant room signage.
- Classroom addition.
- Enclosed connector between main building, gym, and classroom addition.
- Update and remodel existing administrative area.
- Front office addition housing secure vestibule, fully compliant ADA entrance, and some administrative area.
- Kitchen addition to serve classroom addition.
- Remodel and update kitchen.
- Install canopies at student loading and unloading areas.
- Update playscape equipment.
- Update steel frame single pane window systems with energy efficient windows systems.
- Repair or replace window screens as needed.
- Install lighting control system.
- Install LED lighting.
- Install gutter, downspouts, and splash blocks (portables).
- Repair or replace aged or damaged lockers, cabinets, and countertops as needed.
- Replace damaged moveable furnishings as needed.
- Seal minor slab cracking and observe for movement; If movement persists, consider engineering study to determine cause and proper mitigation.
- Repair cracking and gaps in wall structure; observe for movement.
- Repair or replace damaged walls, refresh finished surfaces where needed.
- Repair damaged ceilings and refresh finished surfaces as needed.
- Deep clean, repair or replace aged and damaged soft surface and resilient flooring.
- Deep clean, reseal surface cracks, and refresh finished floor surface.
- Deep clean, repair or replace ceramic tile flooring, re-grout re-sealing surface where needed.
- See Safety & Security recommendations on the Facility Details page.
North Elementary - East Wing
- Install a secure entry vestibule if facility is to be occupied by students with no connecting corridor.
- Demolition of East Wing structure.
- Abate and replace resilient flooring before facility is occupied by students.
- Deep clean, reseal surface cracking, and refresh concrete finished floor surfaces before facility is occupied by students.
- Deep clean, repair or replace ceramic tile flooring, re-grout and re-seal surface before facility is occupied by students.
- Re-finish wood flooring surface where needed before facility is occupied by students.
- Update steel frame single pane window systems with energy efficient windows systems when building is occupied.
- Install additional receptacles in classrooms if building is to occupied by students.
- Install LED lighting if building is to occupied by students.
- Remove all obstruction restricting access to electrical panels; Label floor if needed.
- Update to fiber cabling and devices to support secure Wi-Fi as needed if building is to occupied by students.
- Review intercom system, update cabling and devices as needed if building is to occupied by students.
- Install lighting control system if building is to occupied by students.
- Kitchen has been striped of most equipment, replace equipment when needed.
- Repair or replace damaged shelving, cabinets, and countertops when needed.
- Replace damaged moveable furnishings when needed.
- Repair and re-seal cracks in floor and construction joints after and if mitigation is completed for foundation, observe for movement.
- Repair cracking and gaps in wall structure; observe for movement.
- Refresh high touched interior wall finished surfaces before facility is occupied by students.
- Repair of replace aged or damaged ceilings before facility is occupied by students.
- See Safety & Security recommendations on the Facility Details page.
North Elementary - Gym
- Install a secure entry vestibule if facility is to be occupied by students with no connecting corridor.
- Deep clean, repair or replace aged and damaged flooring as needed for use.
- Install LED lighting if building is to occupied by students.
- Update to fiber cabling and devices to support secure Wi-Fi as needed if building is to occupied by students.
- Install lighting control system if building is to occupied by students.
- Repair or replace damaged shelving, cabinets, and countertops when needed.
- Replace damaged moveable furnishings when needed.
- Replace window AC and ceiling heaters as the use requires.
- Repair interior wall surface and refresh finished surfaces.
- Replace damaged and stained ceiling tiles as needed.
- Clean and refresh finished ceiling surfaces.
- See Safety & Security recommendations on the Facility Details page.
North Elementary - Middle Wing
- Demolition of Middle Wing structure.
- Install a secure entry vestibule if facility is to be occupied by students with no connecting corridor.
- Replace aged and damaged resilient flooring.
- Repair or replace damaged liquid applied flooring.
- Install additional receptacles in classrooms if building is to occupied by students.
- Install LED lighting if building is to occupied by students.
- Update to fiber cabling and devices to support secure Wi-Fi as needed if building is to occupied by students.
- Review intercom system, update cabling and devices as needed if building is to occupied by students.
- Update fire alarm system if building is to occupied by students.
- Install lighting control system if building is to occupied by students.
- Replace HVAC units at or past their useful life expectancy by 2025.
- Repair wall surfaces and refresh finished surfaces.
- Replace damaged and aged ceiling tiles.
- See Safety & Security recommendations on the Facility Details page.
North Elementary - West Wing
- Enclosed connector between permanent campus buildings.
- Promote stable soil conditions around foundations of permanent structures by creating positive storm water drainage away from structures and eliminating standing water next to foundations.
- Remodel entrance vestibule to provide a secure entry vestibule inside a monitored, controlled entrance.
- Demolition of West Wing.
- Replace damaged and missing window screens if building is to occupied.
- Update door hardware and refresh finish surfaces if building is to occupied.
- Install additional receptacles in classrooms if building is to occupied by students.
- Install LED lighting if building is to occupied.
- Update to fiber cabling and devices to support secure Wi-Fi as needed if building is to occupied by students.
- Review intercom system, update cabling and devices as needed if building is to occupied by students.
- Install lighting control system if building is to occupied by students.
- Repair uneven surfaces to reduce potential tripping hazards.
- Install ADA compliant landing at exterior doors as needed.
- Update restroom accessories and stalls as needed.
- Repair or replace aged or damaged lockers, cabinets, and countertops as needed when occupied.
- Replace moveable furnishings as needed when occupied by students.
- Replace HVAC systems in portables if retaining building and occupied.
- Repair damaged roadways and parking, slurry coat asphalt surfaces, re-striping all parking, stripe bus lanes, and stripe pick up lanes; As needed and when occupied.
- Update HVAC controls systems in portables if HVAC units are replaced and structures are occupied.
- Text and balance HVAC systems in portables if HVAC units are replaced and structures are occupied.
- Repair cracking and gaps in wall structure; observe for movement.
- Refresh high touched interior wall finished surfaces before facility is occupied.
- Repair of replace aged or damaged ceilings before facility is occupied.
- See Safety & Security recommendations on the Facility Details page.
South Elementary School - Main, Modular, Portables
- Cooperatively with foundation study, promote stable soil conditions around foundation by creating positive storm water drainage away from structure and eliminating standing water next to foundation.
- Install HVAC for server in Modular classrooms.
- Enclosed connector between main building, gym, and modular classrooms.
- Update playscape equipment.
- Construct a secure vestibule at main entrance. *
- Front office renovation of existing offices.
- Front office addition housing secure vestibule, fully compliant ADA entrance, and some administrative area.
- Install canopies at student loading and unloading areas.
- Add directional signage, ADA compliant parking signage and ADA compliant room signage.
- Classroom addition.
- Remodel and update kitchen.
- Kitchen addition to serve classroom addition.
- Library Addition.
- Update playscape equipment.
- Install HVAC for server in Modular classrooms.
- Kitchen and Library addition to serve classroom addition.
- Deep clean, repair or replace aged and damaged soft surface flooring.
- Repair cracking of finished concrete surfaces and re-seal where needed.
- Deep clean, repair or replace ceramic tile flooring, re-grout re-sealing surface where needed.
- Re-finish wood flooring surface where needed.
- Replace old window system with energy efficient window systems.
- Refresh finished surface on exterior and interior doors as needed.
- Repair or replace aged or damaged lockers, cabinets, and countertops as needed.
- Remove all obstruction restricting access to electrical panels; label floor if needed.
- Replace damaged moveable furnishings as needed.
- Refresh high touched interior wall finished surfaces.
- Slurry coat asphalt surfaces and re-striping stadium field parking.
- Replace or refinish wood paneling.
- Repair damaged ceilings and refresh finished surfaces as needed.
- Replace damaged and aged ceiling tiles with 2X2 grid and tiles.
- See Safety & Security recommendations on the Facility Details page.
South Elementary School - Track & Field Stadium w/ Tennis Courts
- Replace portables structures providing concessions, restrooms, and training areas with permanent construction appropriate for multi sport use.
- ADA compliant seating for bleachers with walkways and ramps.
- Add directional signage, ADA compliant parking signage and ADA compliant room signage.
- Repair tennis court surface, patch surface as needed.
- Repair or replace aged and damaged resilient flooring.
- Repair or replace damaged or missing window seals as needed.
- Refresh finished door surface as needed.
- Install LED lighting in structures.
- Install lighting controls in structures.
- Update cooking equipment as appropriate.
- Refresh high touched interior wall finished surfaces.
- Replace damaged and stained ceiling tiles as needed.
- Refresh exterior finished surfaces.
- Repair tennis court finish surface.
- See Safety & Security recommendations on the Facility Details page.
South Elementary School - Gym
- Install conditioned air in Gym.
- Install conditioned air in Gym.
- Deep clean, reseal surface cracks, and refresh finished floor surface.
- Install LED lighting.
- Install data system.
- Review intercom system, update cabling and devices as needed.
- Install lighting control system.
- Install splash blocks at downspouts.
- Install protective surface over exposed vinyl backed insulation.
- Consider installing some type of sound dampening.
- Refresh interior wall finished surfaces.
- See Safety & Security recommendations on the Facility Details page.
Administration - Administration
- Update single pane window systems with energy efficient windows systems. Repair or replace damaged or missing window seals and re-caulk frame as needed.
- Replace weatherstripping and door sweeps on exterior doors as needed. Refresh exterior door finished surfaces as needed. Update door hardware using a district master restricted keyway system, and refresh finish surfaces.
- Replace weatherstripping and door sweeps on exterior doors as needed. Refresh exterior door finished surfaces as needed. Update door hardware using a district master restricted keyway system, and refresh finish surfaces.
- Repair or replace wall structure as needed to support loading and finish surfacing.
- Replace interior door hardware updating to district master restricted keyway system, and refresh finish surfaces.
- Repair wall surface and refresh finished surfaces.
- Install web-based energy management system.
- Test and balance new HVAC units when installed.
- Install LED lighting.
- Update to fiber cabling and devices to support secure Wi-Fi as needed.
- Incorporate facility into central communication system.
- Install lighting control system.
- Repair or replace aged or damaged cabinets and countertops as needed.
- Promote stable soil conditions around foundation by creating positive storm water drainage away from structure and eliminating standing water next to foundation.
- Remodel of facility
- Addition
- Deep clean, repair or replace aged and damaged resilient flooring.
- Update single pane window systems with energy efficient windows systems.
- Repair or replace damaged or missing window seals and re-caulk frame as needed.
- Install ADA compliant landings at back doors and compliant ramps for front parking spaces.
- Repair or replace aged or damaged cabinets and countertops as needed.
- Repair damaged roadways and parking, slurry coat asphalt surfaces and re-striping all parking.
- Repair or replace wall structure as needed to support loading and finish surfacing.
- Repair wall surface and refresh finished surfaces.
- Replace damaged and stained ceiling tiles as needed.
Ag Farm - Ag Barns
- Check fasteners and flashings for tightness and seal on walls, repair or replace as needed. Remove any material at the wall base, remove oxidation, apply inhibitor, reseal, or refresh surface. Repair or replace damaged wall panels as needed.
- Refresh exterior door finished surfaces as needed.
- Clean, refresh finish surface as needed
- Install LED lighting. Remove all obstruction restricting access to electrical panels.
- Install voice and data system.
- Connect facility to district system.
- Install lighting control system.
- Consider installing hard surface paving, marked parking, marked ADA parking.
- Remove debris from site, eliminate outside storage of materials.
- Secure covered storage for feed and tack.
- Clean, reseal floor as needed.
- Refresh the doors finish surfaces as needed.
- Install LED lighting.
- Install lighting control system.
- Consider installing hard surface paving, marked parking, marked ADA parking.
- Clean and refresh interior finish surfaces as needed.
- See Safety & Security recommendations on the Facility Details page.
Completed Projects
Breckenridge Main Campus - ALC and DAEP
- No Projects
Breckenridge Main Campus - Ag Classrooms and Shop with Storage
- No Projects
Breckenridge Main Campus - Athletic & Fine Arts Center
- No Projects
Breckenridge Main Campus - Bailey Auditorium
- No Projects
Breckenridge Main Campus - Buckaroo Stadium
- No Projects
Breckenridge Main Campus - Cafeteria, Home Economics, and Life Skills
- No Projects
Breckenridge Main Campus - High School
- No Projects
Breckenridge Main Campus - Junior High School and Portable
- No Projects
Breckenridge Main Campus - LT Cook Gym and Junior High Field House
- No Projects
Breckenridge Main Campus - Practice Gym
- No Projects
Breckenridge Main Campus - Vocational and Band
- No Projects
Breckenridge Main Campus - Vocational Classrooms
- No Projects
District Services Center - Maintenance, Transportation, Distribution
- No Projects
East Elementary School - Gym
- No Projects
East Elementary School - Main
- No Projects
North Elementary - East Wing
- No Projects
North Elementary - Gym
- No Projects
North Elementary - Middle Wing
- No Projects
North Elementary - West Wing
- No Projects
South Elementary School - Main, Modular, Portables
- No Projects
South Elementary School - Track & Field Stadium w/ Tennis Courts
- No Projects
South Elementary School - Gym
- No Projects
Administration - Administration
- No Projects
Ag Farm - Ag Barns
- No Projects
Facility Dashboard, and its Facility Condition Assessment (“FCA”) assumes “like for like” system(s). It does not take into consideration design changes or code upgrades. The Facility Condition Index (FCI) is a standard facility metric that evaluates a facilities identified deficiencies against the replacement cost of the entire facility to arrive at a replacement cost ratio. Our cost estimates are in current day dollars and should be used for planning purposes only. We encourage and recommend review and updating of your construction scope and estimates prior to seeking funding.