Connally ISD - Elementary School - Main

Elementary School - Main
color for 0-40% 0-40%
color for 41-70% 41-70%
color for 71-100% 71-100% FCI
Facility Scorecard
Name: Elementary School - Main
Address: 300 Cadet Way Waco, Tx 76705
Year Built: 1961
Square Footage: 65,209
Replacement Cost Built: $36,672,322
Condition Budget: $17,422,419
Facility Condition Index: 57%
Executive Summary

Built in 1961, with an addition in 1987, the Connally elementary School facility serves grades 4th and 5th and is in fair condition but is in need of maintenance and repair of various building components. The roof should be replaced due to age and systemic leaks and older HVAC system components should be addressed at the time of replacement. Energy efficiency updates should be made to the lighting systems and window systems. Updates to interior classroom spaces are recommended. In addition, safety and security recommendations should be considered. In all, the interior of the facility is in fair condition. Closer inspection of building systems and structures may be necessary, the results of those findings could impact the overall cost of renovation and are not included in this assessment. The district should consider the overall district plans for grade alignment, grade location, district safety, and other campus needs in regard to a renovation, or campus replacement. At minimum, a complete renovation of the interior of the building is recommended as many building systems have reached their life expectancy.