Early Childhood
- See Safety & Security recommendations on the Facility Details page.
- Inspect exterior expansion caulking and repair as necessary.
- Repair cracking in exterior tilt wall.
- Drinking fountains and sinks in poor condition or that do not meet ADA accessibility standards should be replaced.
- Building mechanical systems 30 years of age or older should be closely inspected and repaired or replaced per report.
- HVAC system components at or beyond the useful life expectancy should be replaced.
- Replace ductwork as needed, update HVAC controls, and test and balance HVAC systems after system upgrades.
- Single ply roof is at the end of useful life expectancy and should be planned for replacement.
- Metal roof is at the end of useful life expectancy and should be planned for replacement, at a minimum repairing the roof leaks should occur.
- ADA updates are needed; ADA parking signage is needed for center lot; Signage directing occupants to closest accessible restroom is needed; Renovate non-ADA compliant restrooms.
Elementary School - Gym
- See Safety & Security recommendations on the Facility Details page.
- Evidence of potential foundation movement was observed; Cracking should be observed and watched for continued movement; If movement continues, consider contracting with an engineer to determine cause and solution for movement.
- Install compliant handrail on stairs.
- Update restroom fixtures and stalls to meet ADA compliance.
- Install an additional drinking fountain mount at an appropriate height to comply with ADA.
- Building mechanical systems 30 years of age or older should be closely inspected and repaired or replaced per report.
- Replace HVAC system components at or beyond the end of useful life expectancy.
- Update HVAC system controls, instrumentation, test, and balance HVAC systems after new unit installation.
Elementary School - Main
- See Safety & Security recommendations on the Facility Details page.
- Replace roofing material and inspect decking.
- Replace HVAC system components at end of useful life expectancy.
- Inspect and repair damaged exterior expansion caulking.
- Significant issues with building mechanical systems were reported, the systems should be closely inspected and repaired or replaced per report.
- Slope on eastern most sidewalks exceed (1:12) and should be replaced.
- Extend sidewalks to playgrounds and repair unlevel sidewalks.
- Update original hall restroom fixtures and stalls to meet ADA compliance.
- One additional ADA van space is needed in each parking lot with additional signage.
- Update and replace damaged kitchen equipment.
- Update outdated playground equipment.
- Inspect and repair exterior door sweeps.
High School - Football Athletics
- See Safety & Security recommendations on the Facility Details page.
- Possible foundation movement observed at Ticket Office, consider consulting with an engineer to determine cause and solution for building movement.
- Replace HVAC system components at or beyond useful life expectancy.
- Modified Bitumen roofing is in fair condition and is at the end of useful life expectancy, roof leaks were observed, and the roof should be planned for replacement.
- Replace windows at press box, at a minimum, reseal around the windows and window frames.
High School - Roundball Athletics
- See Safety & Security recommendations on the Facility Details page.
- ADA updates are needed: Accessible ramps are needed at restrooms, Door hardware needs to be updated at softball restrooms and baseball concessions, and baseball restroom stalls need to be updated.
High School - Main
- Replace modified bitumen roof beyond useful life expectancy.
- See Safety & Security recommendations on the Facility Details page.
- Inspect exterior tilt wall construction and repair cracks and expansion caulking.
- Repair damaged metal panels at base of Administration and ECHS shop building.
- Inspect exterior masonry walls and repair cracked bricks, mortar, and expansion caulking.
- An additional ADA compliant drinking fountain mounted at 36" is needed in the Administration Gym.
- Update fixtures that do not meet water efficiency standards and non-compliant sinks.
- Building mechanical systems 30 years of age or older should be closely inspected and repaired or replaced per report.
- Replace HVAC system components at or beyond useful life expectancy.
- Repair damaged roof soffit on Administration and ECHS building.
- Replace modified bitumen roof as it is in poor condition and the end of useful life expectancy.
- Repair roof seams, flashings, and fasteners on shop metal roof.
- An additional ADA van space is needed at the front parking lot and behind band hall parking; appropriate ADA signage is needed for parking spaces behind band hall and at cafeteria parking.
- Update non-ADA compliant restrooms and provide signage indicating nearest accessible restroom.
- Repair or replace metal drainage covers on sidewalks.
- Building electrical systems should be considered for replacement.
- Fill open slots in electrical panels.
High School - Original 1950 Gym
- See Safety & Security recommendations on the Facility Details page.
- Replace fixtures that are outdated, damaged, or do not comply with water efficiency standards.
- Building mechanical systems 30 years of age or older should be closely inspected and repaired or replaced as necessary.
- Repair and repaint damaged soffit and fascia.
- Refinish exterior doors and replace door hardware with ADA compliant hardware.
- Refinish interior doors and replace non-ADA compliant door hardware.
Junior High
- See Safety & Security recommendations on the Facility Details page.
- Inspect exterior expansion caulking and bricks, repair or replace as necessary.
- Plan for replacing HVAC system components at or beyond useful life expectancy; a majority of units are due for replacement within the next 5 years.
- Single ply roof system is nearing end of useful life expectancy and the system should be planned for replacement.
- An Additional ADA space and adequate ADA van signage is needed in the Northeast parking lot.
- ADA van signage is needed at rear lot.
- Replace single pane or damaged exterior windows with double pane energy efficient window systems; at a minimum, remove and replace window caulking.
Operations - Maintenance
- See Safety & Security recommendations on the Facility Details page.
- Replace HVAC system components at or beyond useful life expectancy; Test and balance HVAC systems after installing new units.
Operations - Transportation
- See Safety & Security recommendations on the Facility Details page.
- Install ADA compliant handrail on wooden stairs.
- Replace HVAC system components at or beyond useful life expectancy.
- ADA van space needed in front public lot.
- Restrooms need grab bars to meet ADA compliance.
- Replace restroom sinks to meet ADA compliance.
- Install ramp to make front entrance ADA compliant.
- Replace non-ADA compliant door hardware.
- Update kitchen cabinets and hardware.
Primary
- See Safety & Security recommendations on the Facility Details page.
- Inspect exterior expansion caulking and repair or replace as necessary.
- ADA van parking signage is needed at Cafeteria lot.
- Repair damaged and cracked sidewalks at the entrance and around the building.
Additional Projects, if Funds Become Available
Early Childhood
- Replace single ply roof past useful life expectancy. This is planned for summer of 2025.
- Kitchen expansion
- Address drainage issues around the facility.
- Repair minor damage and repaint interior masonry and wallboard walls.
- Replace cove base throughout facility.
- Replace 4x2 lay in ceiling tile with 2x2 system.
- Stained and damaged ceiling tiles should be replaced.
- Repair potholes in roadways.
- Remove asphalt, repave, restripe front parking lot.
- Update countertops and cabinets.
- Replace moveable classroom furnishings as necessary.
- Construct pathway to gym.
- Refinish exterior doors.
- Refinish interior wood and metal doors and update door hardware as necessary to meet ADA compliance.
- Update interior lighting to LED fixtures and install lighting control systems.
- Update single pane window systems with energy efficient double pane windows; at a minimum, repair leaking windows at cafeteria.
- Replace older damaged carpet.
- Replace resilient floor tile throughout facility.
- Deep clean ceramic floor tile and grout; damaged ceramic floor tile should be replaced.
- Kitchen expansion.
Elementary School - Gym
- Clean exterior framed masonry veneer.
- Repair cracked masonry walls.
- Refreshing interior wallboard ceilings, walls, wood paneling, and structure is needed.
- Replace 4x2 drop ceiling tile system with 2x2 drop ceiling tile system.
- Roof is past useful life expectancy and replacement should be planned.
- Install additional site lighting to gymnasium.
- Update interior lighting fixtures to LED and install lighting control system.
- Refinish exterior doors.
- Refinish interior doors and replace door hardware as necessary.
- Replace older worn carpet.
- Replace resilient floor tile in poor condition.
Elementary School - Main
- Vestibule
- Sped Restroom
- Library expansion
- Playground updates
- Repair damaged grout and masonry blocks around cafeteria.
- Construct framed wall partitions to combine office space as necessary.
- Consult with an engineer to remove wall separating the cafeterias, creating one large open space.
- Repaint interior masonry and sheetrock walls.
- Replace 2x4 Drop ceiling tile system with 2x2 tile system.
- Replace stained or damaged tectum ceiling materials.
- Possible building movement observed around kitchen; movement should be observed, and an engineer consulted to determine cause of movement and solution.
- Apply slurry coat and repair damaged roadway sections, consider additional signage and markings to prevent wrong way drivers on Cadet Way.
- Apply slurry coat and restripe parking lots.
- Replace older cabinets and shelving throughout the campus.
- Replace older or damaged moveable furnishings as necessary.
- Install additional site lighting around building exterior.
- Update light fixtures to LED and update electrical system wiring.
- Consider updating Voice and Data systems.
- Refinish interior doors and update door hardware as necessary.
- Replace damaged wooden doors and door frames.
- Replace damaged metal doors and door frames.
- Refinish exterior doors.
- Replace windows with energy efficient double pane systems.
- Replace older worn carpet.
- Replace worn resilient floor tile.
- Replace ceramic tile flooring.
- Renovate the Special Education restroom to meet program needs.
- Consider expanding the library.
High School - Football Athletics
- Modified bitumen roof is past useful life expectancy and should be planned for replacement.
- New Scoreboard
- Refinish interior masonry walls as necessary.
- Wood paneling wall system in press box shows evidence of water leaks and should be replaced.
- Refinish damaged wallboard ceilings as necessary.
- Replace damaged lay-in ceiling tile as necessary.
- Apply slurry coat, repair moderate damage, and restripe parking lots with additional ADA spaces at football lot.
- Replace movable furnishings as needed.
- Update lighting fixtures to LED fixtures.
- Refinish exterior metal doors as necessary.
- Refinish interior wooden doors as necessary.
- Replace carpet at end of useful life expectancy in press box and multi-purpose building.
- Replace older, worn, and damaged resilient floor tile.
- Inspect and update football electrical system.
- Replace football scoreboard.
- Update lecture hall seating.
- Update weightroom equipment.
High School - Roundball Athletics
- Replace shingle roof over baseball restrooms.
- Relocation of Softball Field
- Softball batting cage
- Baseball ticket booth
- Repaint interior walls of concessions and restrooms.
- Update lighting fixtures to LED fixtures.
- Consider constructing new softball facility.
- Construct batting cages for softball.
- Add a ticket booth for baseball.
High School - Main
- Drainage
- Clean exterior walls.
- Repair minor cracking on interior masonry walls and repaint all damaged wall surfaces as needed.
- Replace 4x2 lay-in ceiling tiles with a 2x2 system and replace stained and damaged ceiling tiles.
- Refinish damaged interior painted structure.
- Replace ductwork as needed and test and balance HVAC systems after installation of new HVAC system components.
- Fill potholes and apply slurry coat to cracking in roadways.
- Remove asphalt, restripe, and add appropriate ADA signage to front and rear parking lots.
- Replace outdated restroom stalls and accessories in all restrooms except diesel shop.
- Refinish and repair fixed furnishings as necessary.
- Replace movable furnishings as necessary.
- Update lighting fixtures to LED fixtures.
- Refinish exterior hollow metal doors and replace door hardware as necessary.
- Refinish interior wooden doors and replace non-ADA compliant door hardware as necessary.
- Refinish interior metal doors and replace non-ADA compliant door hardware as necessary.
- Replace damaged, or single pane windows with energy efficient double pane systems.
- Replace damaged and worn carpet at end of useful life.
- Replace carpet on band hall stairs.
- Replace damaged resilient floor tile as needed.
- Thoroughly clean ceramic tile and grout, replace damaged and outdated ceramic tile floor finishing.
- Strip and re-apply damaged liquid applied flooring as needed.
High School - Original 1950 Gym
- Renovate locker rooms
- Replace bleachers
- Repair minor cracking on exterior masonry grout and brick.
- Refinish interior masonry walls.
- Remove and replace damaged wallboard walls.
- Replace stained, damaged, or sagging ceiling tiles.
- Update lighting fixtures to LED fixtures.
- Replace damaged resilient floor tiles.
- Deep clean ceramic tile and grout, repair damaged tile and grout as necessary.
- Strip and re-apply liquid applied flooring.
Junior High
- Install new HVAC controls with installation of new units.
- Test and balance HVAC system components after installation of new units.
- Refinish interior masonry wall surfaces as necessary.
- Refinish interior wallboard wall surfaces as necessary.
- Update 4x2 lay in ceiling tile with 2x2 lay in ceiling tile system.
- Adequate ADA signage for rest rooms are needed.
- Remove and replace roadways around Junior High campus.
- Restripe Northeast parking lot and add appropriate ADA spaces and signage.
- Front lot needs slurry coat and moderate work to repair cracking, lot should be restriped.
- An additional 8,000 SqFt of parking is recommended to meet the 5% parking availability for functional capacity.
- Update equipment in home economics classroom.
- Outdated restroom stalls should be updated to a durable HDPE material.
- Refinish damaged countertops as necessary.
- Replace movable furnishings as necessary.
- Update lighting fixtures to LED fixtures.
- Refinish exterior metal doors.
- Refinish exterior storefront doors.
- Refinish interior storefront and wooden doors.
- Older and worn carpet at end-of-life expectancy should be replaced.
- Replace older, worn floor tile at end-of-life expectancy.
- Deep clean ceramic floor tile and repair damaged grout and tiles as necessary.
- Strip and re-apply liquid applied flooring.
Operations - Maintenance
- Install new controls and instrumentation with installation of new HVAC units.
- Test and balance HVAC systems after installation of new HVAC units.
- Refinish interior walls as necessary.
- Repair damaged wallboard ceilings and refinish restroom ceilings.
- Replace stained ceiling tiles as necessary.
- Inspect roof seams, flashings, and fasteners and repair as necessary.
- Apply slurry coat to reseal parking lot and restripe spaces.
- Add appropriate ADA parking and signage to parking lot; two ADA parking spaces including one ADA van space is needed.
- Recommend paving gravel roadways.
- Update interior light fixtures to LED.
- Refinish exterior doors and update non-ADA compliant door hardware.
- Refinish interior wooden doors and update non-ADA compliant door hardware as necessary.
- Replace damaged sections of resilient floor tile as necessary.
Operations - Transportation
- Updates HVAC controls and instrumentation with installation of new HVAC units.
- Test and balance HVAC system components with installation of new HVAC systems.
- Repair minor bends and dings in metal panels and repaint exterior walls.
- Refinish wallboard and wood paneling walls.
- Refinish wallboard ceilings.
- Replace shop ceiling insulation.
- Replace HVAC ductwork as needed with installation of new units; Install new controls and instrumentation with new HVAC units; Test and balance HVAC units after new unit installation.
- Pave gravel lot, remove and repave front lot and add ADA compliant parking.
- Update lighting fixtures to LED fixtures.
- Refinish hollow metal exterior doors and replace non-ADA compliant hardware.
- Refinish interior doors and replace door hardware as necessary.
- Update single pane windows with double pane window systems.
- Replace older, worn, and damaged resilient floor tile.
- Replace resilient sheet flooring.
- Concrete floor with carpet previously installed should be sanded and sealed.
Primary
- Pave gravel parking lot
- Refinish interior masonry and wallboard walls as necessary.
- While ceiling tile is generally in good condition, update the ceiling tile grid from 4x2 lay in ceiling tile to 2x2 lay in ceiling tile system and at a minimum, replace stained or damaged ceiling tiles.
- Inspect cafeteria staff restrooms for proper seal on plumbing fixtures.
- Repair potholes and moderate cracking and apply slurry coat to minor cracking to extend life of roadways.
- Repair moderate cracking, apply slurry coat to minor cracking, and restripe front parking lot.
- Update restroom stalls.
- Refinish damaged cabinet doors.
- Replace movable furnishings as needed.
- Update lighting fixtures to LED fixtures.
- Refinish exterior metal doors.
- Refinish interior wooden doors.
- Replace window systems with double pane energy efficient window systems.
- Replace damaged resilient floor tiles as necessary.
- Deep clean ceramic tile and grout, replace any damaged or missing grout and tile.
- Pave gravel parking lot.
Completed Projects
Early Childhood
- No Projects
Elementary School - Gym
- No Projects
Elementary School - Main
- No Projects
High School - Football Athletics
- No Projects
High School - Roundball Athletics
- No Projects
High School - Main
- No Projects
High School - Original 1950 Gym
- No Projects
Junior High
- No Projects
Operations - Maintenance
- No Projects
Operations - Transportation
- No Projects
Primary
- No Projects
Facility Dashboard, and its Facility Condition Assessment (“FCA”) assumes “like for like” system(s). It does not take into consideration design changes or code upgrades. The Facility Condition Index (FCI) is a standard facility metric that evaluates a facilities identified deficiencies against the replacement cost of the entire facility to arrive at a replacement cost ratio. Our cost estimates are in current day dollars and should be used for planning purposes only. We encourage and recommend review and updating of your construction scope and estimates prior to seeking funding.